BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Fullerton, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Work shall consist of, but not limited to, removing and constructing concrete hardscape such as curb & gutter, sidewalk, access ramps, spandrels, and cross gutters, removal of existing pavement and construction of new asphalt concrete pavement, adjustment of manholes and water valve boxes, signing and striping, traffic control, water pollution control, and all related work. No Bid will be accepted unless it is made on the Bid Schedule form furnished by the Public Works Department, Engineering Division contained within the Specifications. The time of completion of contract shall be ninety (90) working days as defined in the Standard Specifications for Public Works, 2018 Edition. Liquidated Damages, as defined in the referenced specifications, Section 6-9, shall be $2,200 per calendar day. The Engineer's estimate for this project is $1,400,000. The City intends to issue a Notice to Proceed on or before March 28, 2022. Contractor will take full responsibility for completing all precursory requirements necessary for this issuance. Contractor shall take note of the following dates and milestones: March 14, 2022 Preconstruction Meeting Contractor shall provide all labor, materials, tools, equipment and incidentals for the work, complete in place. The Contractor agrees to commence the work and related services upon the receipt of a written Notice to Proceed from the City. It is the Contractors responsibility to provide sufficient and qualified personnel, equipment and materials. Each bid must be accompanied by a certified or cashier's check, or bidder's bond, made payable to the City of Fullerton, for an amount equal to at least 10% of the amount bid, such guarantee to be forfeited should the bidder to whom the contract is awarded fail to enter into the contract. In addition, a Performance Bond in the amount of 100% of the bid, and a Labor and Materials Bond in the amount of 100% of the bid shall be required of the successful bidder prior to entering into a contract. The City will permit substitution of approved securities for monies retained on this project in accordance with Section 7-3.2 of the Standard Specifications for Public Works Construction ("Greenbook"), 2018. The Contractor shall also provide Commercial General Liability Insurance, Comprehensive Automobile Liability Insurance, Workers' Compensation, and if necessary, Umbrella/Excess Liability to the minimum limits as defined in the Supplemental Information to Bidders with Certificates of Insurance for each form of coverage. No contract will be awarded to any contractor who has not been licensed in accordance with the provisions of Chapter 9 of Division III of the State Business and Professions Code, Section 7,000, et seq. The Contractor shall possess the appropriate legal and necessary licenses required to complete the work as shown in this contract at the time the bid is submitted. No contractor or subcontractor may be listed on a bid proposal for public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code 1725.5 and Senate Bill 854. All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. If the City Council makes an award, it will be to the lowest responsible bidder. For Unit Price bids, in the event there is a discrepancy between the extension and the unit cost, the unit cost will prevail. The City Council reserves the right to reject any and all bids, to waive any informality in the bidding, and to accept any bid or portion thereof, by order of the City Council of the City of Fullerton.

Award

Roads / Highways

$1,397,367.00

Public - City

Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
108
Bidding Soon
2,314
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2022

March 28, 2022

img_map_placeholder

Multiple Locations, Fullerton, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.