BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Warrington, Pennsylvania. Completed plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

The project includes the construction of approximately 1,335 linear feet of 8-inch ductile iron water main, jack and boring of 8-inch ductile iron pipe across SR 611 at 2 locations, 585 linear feet of 6-inch ductile iron pipe, 2,805 linear feet of 1aEUR K-copper service line, 3 fire hydrant assemblies, connections of 37 services with meters, backflow preventers and pressure reducing valves, and water main appurtenances. Also included is the well abandonment at 15 properties. Construction will occur in State and Township rights-of-way and easement areas, and will involve restoration of roadway, mill and overlay of roadways, lawn areas, traffic control and provisions for all necessary erosion and sedimentation controls in Warrington Township. Base Bid Items consist of the Contractor to furnish and install items.Alternate bid Items included with this project consist of North Wales Water Authority supplying pipe/water main appurtenances where the Contractor will install only. This project is funded through a Cooperative Agreement with the Air National Guard (ANG) as well as an H2O Grant from the Commonwealth of Pennsylvania. Each bid must be accompanied by a certified check drawn in the order of North Wales Water Authority, or a Bid Bond in favor of North Wales Water Authority in the amount of 10% of the bid price. Said check or bond shall be subject to the conditions provided in the Instructions to Bidders. The work in connection with this project constitutes a Public Works by a Public Body under Pennsylvania Prevailing Wage Act. Bidders are advised that prevailing minimum wage rates, promulgated by the Pennsylvania Secretary of Labor, must be paid to workmen employed on this project. No bid may be withdrawn within sixty (60) days of the date of the bid opening. The North Wales Water Authority reserves the right to reject any and all bids and to waive any bidding informalities CLARIFICATION DEADLINE 2/23/2022 4:00 PM

Award

Water / Sewer

$1,053,280.00

Public - City

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
197
Bidding Soon
4,060
All Active Projects
1,877
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 31, 2022

img_map_placeholder

To Be Determined, Warrington, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.