BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in San Marcos, California. Completed plans call for the renovation of a theater / auditorium.

The work generally consists of replacing and installing lighting system at the City of San Marcos Community Center Main Hall that services three main functions: Extension Meeting Area for public meetings for city council and planning, Theatrical and Stage Productions, General Meetings; dining, training, events, banquets, etc. A detailed Scope of Work can be found in the IFB Documents. PRE-BID CONFERENCE None. PROJECT FUNDING This project is funded in whole or in part with the following funds: Local Public, Education and Governmental (PEG) funds and Other Eligible Funds as needed PREVAILING WAGE NOTICE IS HEREBY GIVEN that, payment of prevailing wages and compliance with the California Labor Code Sections 1770 et seq is required for this project. The Contractor will be required to comply with all of the terms and conditions (including State General Prevailing Wage requirements) prescribed for Contractor performing public works construction projects. The California Department of Industrial Relations determines the general prevailing wage rates for the State, which are available at electronically or from the City of San Marcos' City Clerk Department. DIR REGISTRATION Under SB 854, contractors and subcontractors performing work on public works contracts are required to register with the Department of Industrial Relations (DIR) on an annual basis (July 1-June 30). All contractors and subcontractors submitting bids will be required to have registered in advance with the DIR and must meet the minimum program qualifications necessary to be eligible to work on public works projects pursuant to Labor Code section 1725.5 and Public Contract Code Section 4104. TIME OF COMPLETION All work shall be completed to the satisfaction of the Agency in conformance with the Contract Documents within 3-4 months after the date of commencement specified in the Notice to Proceed. CONTRACTORS LICENSE The Contractor shall possess at the time the contract is awarded, a California Contractors license classification B, and C-10. Coordination with City's Theatrical Lighting equipment provider will be required.

Award

Theaters / Auditoriums

$108,500.00

Public - City

Renovation

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
97
Bidding Soon
2,207
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

March 16, 2022

img_map_placeholder

3 Civic Center Dr, San Marcos, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.