BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Addition to a pre-engineered storage facility in Castle Rock, Colorado. Conceptual plans call for the addition of a pre-engineered storage facility.

Funding is requested to expand the current salt/sand shed located at 675 Justice Way. The expansion will be used to stockpile the salt/sand mix used in the Snow and Ice Control Program. Additional funds are requested in the future to construct a smaller shed immediately adjacent to the existing shed to store the salt mix used downtown and in icebreaking operations. The present storage capacity of the shed has in recent years been insufficient to store all the material needed for winter plowing and ice mitigation operations, forcing the Town to purchase additional material when pricing is at the highest. Being able to stockpile sufficient material for the entire season would allow for the entire purchase to be made when pricing and demand is at its lowest. In addition to the cost savings, as the 2019-2020 season demonstrated, when demand is at its highest distributors will begin an allocation process that provides some material but not allow for entire order fulfillment because nearly all municipalities are asking for material with limited ability to supply it. A smaller shed (96' x 50') is also requested with construction in five years as the need for the separation of the two salt piles becomes necessary. The smaller shed would be used to store the salt mix for downtown and ice mitigation. The expected capacity of this shed would accommodate 1,500 tons of salt mix and is expected to be sufficient for downtown operations and more than doubles the current capacity for ice litigation. This is enough material to carry the Town through a season for the foreseeable future at current application rates and accommodate Town growth to roughly 1,800 lane miles. As January 19, 2023, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2026. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Warehouse / Distribution - Pre-Engineered Storage Building

$400,000.00

Public - City

Addition

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
34
Bidding Soon
940
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

img_map_placeholder

675 Justice Way, Castle Rock, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.