Site work and paving for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and sidewalk / parking lot.
**As of March 15,2024 project was awarded to American West Construction, awarded amount is $3,285,162.30.** Reference Number 0000338318 Easterly Creek is a tributary to Westerly Creek in the northwest area of town and Del Mar Parkway is currently aligned where the creek bed of Easterly Creek historically used to be. An Outfall Systems Plan (OSP) for Easterly Creek was completed in 2012 that identified several recommendations to help improve storm flows and water quality and reduce flooding in the area. The Havana Park detention pond was one of the projects identified. The Havana Park detention pond was originally constructed to store approximately 8 acre-feet of runoff. The pond is known to have overtopped several times at the north end, overflowing into East 11th Avenue flooding areas of town to the west. The bottom of the pond has silted in over the 50 plus years of its existence and the outlet works for the pond have severely deteriorated, as the invert of the 18-inch corrugated metal pipe (CMP) outlet pipe is completely corroded. The improvement plan identified re-grading the pond for increased storage volume and water quality volume and for modifications to the pond inlet for more efficient delivery of flows to the pond. Through design Aurora Water worked closely with PROS to ensure the existing park and playground equipment at this site were incorporated into the final design. The City is planning to construct improvements to minimize flooding, to protect life and property and to improve water quality. Specifically, project construction includes: 10,400 cubic yards of earthwork, 460 feet of storm pipe ranging in size from 24-inch diameter to 54 inch diameter, 9 inlets, 10 manholes, concrete inlet and outlet structures, concrete forebay, 635 cubic yards of riprap, 156 feet of curb and gutter, 3 ADA curb ramps, 1100 feet of sidewalk, full depth asphalt, seeding, traffic control, erosion control and other miscellaneous items necessary to complete the work. Question Acceptance Deadline 01/18/2024 02:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Clint Weisz, Project Manager, at cweisz@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. The Contract Documents require that all work be Substantially Complete by October 30, 2024, with Final Completion by November 29, 2024 Liquidated Damages which are $1,200.00 per day. The estimated cost for this project is from $3,200,000.00 to $3,500,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond, Certified Check or Cashier's Check made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. The City shall have the right to reject any and all Bids. A Bid not accompanied by the required Bid Security, other data or documentation required, or a Bid in any other way incomplete, irregular or unqualified, may be subject to rejection.
Award
Roads / Highways
$3,285,162.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2024
April 1, 2024
Multiple Locations, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jun 14 2021
Aurora, CO
Bid Date: Mar 28 2022
Aurora, CO
Bid Date: Mar 07 2022
Aurora, CO
Bid Date: Apr 29 2022
Aurora, CO
--
Aurora, CO
Bid Date: Apr 28 2022
Aurora, CO
Bid Date: Apr 21 2022
Aurora, CO
Bid Date: Mar 11 2022
Aurora, CO
Bid Date: Apr 15 2022
Aurora, CO
Bid Date: Apr 14 2022
Aurora, CO
--
Aurora, CO
Bid Date: Mar 24 2022
Aurora, CO
Bid Date: Dec 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.