Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 26, 2022 at 7:00 PM
Updated November 15, 2023
Site work and paving for a mixed-use development in Statesboro, Georgia. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Request for Proposal ENG-122c: Hwy. 24 Sidewalk from US 80 to Packinghouse Rd. The City of Statesboro Engineering Department is requesting for proposals, engineering design services for sidewalk improvements along East Main Street (SR24) from Northside Drive (US 80) to Packinghouse Road. If you have any questions, please contact Darren Prather at 912-764-0642 or darren.prather@statesboroga.gov PROJECT LIMITS AND OVERVIEW The project includes design for improving a 24 foot wide paved roadway for a sidewalk on the north side of the road for a distance of approximately 1,800 feet from Northside Drive eastward and terminating at Packinghouse Road. A typical GDOT roadway pavement section is to be used for inclusion of the sidewalk. The design task involves survey for locating the existing right-of-way and stream crossing and design of a new culvert crossing. A hydrology study and hydraulic calculations for the culvert design will be required. A site location map is attached for your reference. SCOPE OF SERVICES Design plans shall be in Georgia Department of Transportation format and all design shall be in accordance with the latest AASHTO, MUTCD and Georgia Department of Transportation Standards and Specifications. Erosion control plans shall be in accordance with latest NPDES and Georgia EPD requirements. All survey will be done on state plane coordinates. The plan set shall consist of cover, notes, quantities, plan and profile with cross-sections at 50 foot intervals, utility plans, erosion and sediment control plans, details, and right-of-way plans. The proposal shall include project approach of design, staking of any required right-of-way and easements. Preparation of right-of-way plans and documents shall also be included as part of this proposal. The proposal shall include assistance with all applicable GDOT permitting necessary for this project. The proposal shall include a construction cost estimate to be used for bid tabulation. The format shall be a MS Excel spreadsheet. Upon the City of Statesboro's acceptance of the completed plans, the consultant shall provide an electronic copy of files and drawings in AutoCAD format. The City expects the design plans for the project to be completed by May 2022, so that any right-of-way or construction easement acquisition can take place shortly after and construction can commence as early as possible. This project is funded with City TSPLOST funds. The method of contractor selection has not been determined at this time.
Conceptual
Sidewalks / Parking Lot
$300,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2023
GA-24, Statesboro, GA
Related To This Project
Statesboro, GA
Bid Date: Jan 20 2022
Statesboro, GA
Bid Date: Nov 22 2021
Statesboro, GA
Bid Date: Feb 04 2022
Statesboro, GA
--
Statesboro, GA
Bid Date: Feb 17 2022
Statesboro, GA
--
Statesboro, GA
Bid Date: Mar 10 2022
Statesboro, GA
Bid Date: Feb 03 2022
Statesboro, GA
--
Statesboro, GA
Bid Date: Jan 04 2022
Statesboro, GA
Bid Date: Dec 20 2021
Statesboro, GA
Bid Date: Nov 08 2023
Statesboro, GA
Bid Date: Sep 08 2023
Statesboro, GA
Bid Date: Aug 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
