BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2022 at 8:00 PM

Updated November 15, 2023

Renovation of a civil project in Cottage Grove, Oregon. Completed plans call for the renovation of a water / sewer project.

The successful bidder will provide Equipment that shall be pre-purchased for installation by others within an existing circular secondary clarifier tank at the City of Cottage, Oregon Wastewater Treatment Plant (WWTP). The existing Secondary Clarifier No. 1 is a center feed, peripheral overflow design with an outboard concrete launder and center sludge hopper configuration. The Equipment shall be designed for gravity separation of mixed liquor solids from the activated sludge process and shall be specifically designed for installation within the existing Secondary Clarifier No. 1 and existing conditions. Equipment shall be furnished complete with all mechanical and electrical components and accessories required for proper installation and operation, including complete drive units and controls, and any additional materials or construction required by the manufacturer to meet the requirements of the pre-purchase package. The supplier shall furnish a system that is fully coordinated and operating properly. All items required for a complete and properly operating system shall be provided, whether specifically called for or not. Est. Value: $ 585,000.00 Est. Completion Date: Dec. 30, 2022

Award

Water / Sewer

$433,770.00

Public - City

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
10
Bidding Soon
219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 21, 2022

Project location map

1800 N Douglas Ave, Cottage Grove, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.