BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 8, 2022 at 7:00 PM

Updated November 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in River Forest, Illinois. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.

The Keystone Tennis Court Paving Project includes the removal and replacement of five (5) tennis courts, new basketball court area, new fencing, new sidewalks, new storm sewer, at grade detention, retaining walls, hitting walls, sidewalk lights, and other miscellaneous improvements. A Certified Check, Cashier's Check or Bid Bond payable to the River Forest Park District for not less than five (5) percent of the total bid amount will be required for each bid. The successful bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Payment Bond for the total Contract Amount. The successful bidder will also be required to execute AIA Form A101 - 2017 as the contract between the parties. In all work performed under this Contract, the Contractor and all of its subcontractors shall comply with the current provisions of the Prevailing Wage Act of the Illinois Revised Statutes, Chapter 48, Sections 39s-1 et seq.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
462
Active Projects
266
Bidding Soon
3,341
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

June 1, 2022

Project location map

430 Keystone Ave, River Forest, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.