Demolition, site work, paving and new construction of a mixed-use development in Wright Patterson AFB, Ohio. Working plans call for the construction of a 35,644-square-foot military facility; for site work for a military facility; for the demolition of a military facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and military facility.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information This project has been canceled in its entirety. DESCRIPTION: The proposed project is a design/bid/build project to construct a single story, 300-member Army Reserve Center (ARC) on Wright-Patterson Air Force Base (AFB). The building will be approximately 35,644 SF. Building will be of permanent construction with reinforced concrete foundations; concrete floor slabs; Architectural insulated precast walls; poly-vinyl chloride (PVC) roof system; standing seam metal roof system; structural steel frame; concrete vault with IDS; Heating, Ventilation and Air Conditioning (HVAC); plumbing, mechanical, and security systems; communications systems; electrical systems; automatic sprinkler system and fire detection. Site work includes demolition; land clearing; grading; concrete and asphalt paving; concrete sidewalks; access roads; mobile Kitchen trailer (MKT) pad; fencing; general site improvements and utility connections. Accessibility for the disabled will be provided. LEED v4.0 certification is required at a Silver level. Options to the contract may include the following: OMAR funded items for primary facility (Training Building) Bona fide need OMAR funded items for the primary facility (Training Building) Construct an Unheated Storage Building (UHS). Work includes concrete aprons, insulated metal wall panels on pre-engineered structural steel frame, insulated standing seam metal roof panels, insulated doors, and sectional overhead doors. OMAR funded items for primary facility (UHS) Bona fide need OMAR funded items for the primary facility (UHS) Construct a gravel overflow parking lot. Design and construct a 10kW photovoltaic (PV) array on a single stem parking structure in the POV parking lot. This option can be exercised up to four (4) times. Contract duration is estimated at 754 calendar days. A Pre-proposal site visit will be held. Meeting and site visit details will be provided in Section 00100 of the solicitation. CONSTRUCTION MAGNITUDE: The Estimated Price Range is between $10,000,000 and $25,000,000, in accordance with DFARS 236.204. SELECTION PROCESS: This is a one phase procurement. The proposals will be evaluated using a Best Value Trade Off source selection process. The technical information contained in the Offeror's proposal will be reviewed, evaluated, and rated by the Government. The proposal for this procurement, at a minimum, will consist of the following: Prime Contractor Past Performance, Technical, and Price. Pro Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation. All evaluation factors, other than price, when combined, are considered more important than cost or price. DISCUSSIONS: The Government intends to award without discussions but reserves the right to conduct discussion should it be deemed in the Government's best interest. NAICS: The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. Size Limitation is $36.5M. TYPE OF SET-ASIDE: This is a Full and Open procurement. The resulting award will be for one (1) Firm-Fixed-Price (FFP) contract. ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 7 February 2022. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted to http://www.sam.gov. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at the System for Award Management (SAM) database at http://www.sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at http://www.sam.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Krishna Menon at Krishna.k.menon@usace.army.mil. This announcement serves as the Advance Notice for this project. Responses to this synopsis are not required. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$25,000,000.00

Public - Federal

Demolition, LEED Certification, New Construction, Paving, Site Work

439

56

55

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
57
Bidding Soon
1,335
All Active Projects
613
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2022

September 5, 2022

img_map_placeholder

To Be Determined, Wright Patterson AFB, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.