BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Las Vegas, Nevada. Completed plans call for site work for a water / sewer project.

https://tulsaworld.com/ap/state/nevada-senator-asking-congress-to-ok-vegas-area-water-pipeline-through-us-conservation-area/article_ff0264a5-6180-5a17-b20b-6cfeb69b53dd.html A proposal to tunnel beneath a national conservation area to install a second pipeline to deliver Colorado River water to a large swath of suburban Las Vegas has drawn support from Nevada's senior Democratic senator. U.S. Sen. Catherine Cortez Masto announced Thursday she introduced legislation asking Congress to let the Southern Nevada Water Authority drill the underground pipeline through part of Sloan Canyon National Conservation Area. "This legislation will increase the capacity of our entire water system in the (Las Vegas) valley while protecting our unique ecosystems and the residents and businesses in Henderson," Cortez Masto said in a statement. Federal funds are not part of the $2.5 billion project cost, and construction is not expected to begin for at least two years, said Bronson Mack, water authority spokesman. Construction is not expected to disturb the desert surface, although survey work would be conducted. Southern Nevada water users will fund the work, Mack said, and the pipeline won't increase the amount of water the region draws from the drought-depleted Lake Mead reservoir behind Hoover Dam. The Las Vegas area, in the Mojave Desert, is home to 2.4 million residents and attracts some 40 million visitors per year. It is almost completely dependent on water from the Colorado River. "We're still in the permitting phase," Mack said. "We expect about two years of engineering design work and about two years for construction." The water authority calls the Sloan Canyon route, dubbed the Horizon Lateral, "preferred" over an alternate that would install the 10-foot (3-meter) diameter pipeline beneath homes and businesses that have sprouted in recent decades in Henderson. Cortez Masto and Mack said the urban route could add $200 million to the cost of the project. Plans call for the pipeline to run perhaps 40 miles (64 kilometers) from existing Lake Mead intakes almost to Interstate 15. Mack said about 8 miles (13 kilometers) would be beneath the conservation area. The water authority official said the goal is "redundancy and increased water service reliability." The pipeline would provide a backup to one existing pipeline completed in 1999 that now serves nearly 1 million people, or 40% of water authority customers, in fast-growing parts of Henderson and Las Vegas. Cortez Masto's request is for congressional approval to allow construction through the federal reserve. It would also expand the boundary of the conservation area by about 16% making it more than 90 square miles. The legislative move came just days after Republican Gov. Joe Lombardo signed a law passed by the Democratic-controlled Legislature to let the Southern Nevada Water Authority restrict the amount of water provided to homes -- if the federal government further dials back Nevada's share of water drawn from the river. The Sloan Canyon conservation area was designated by Congress in November 2002. It offers desert and mountain hiking with scenic views of the Las Vegas area and encompasses the 23-square-mile (59.5-square-kilometer) North McCullough Wilderness. It features a culturally significant site with ancient rock drawings, called petroglyphs, representing native cultures believed to date back thousands of years. ____________________________________________________________________________________________ The Southern Nevada Water Authority (Owner) is soliciting submissions from qualified and interested firms to provide early contractor involvement feedback specifically related to tunneling options for the Owners Horizon Lateral Project Questions Due Date: Feb 5th 2022, 10:00 AM PST Currently pre-design efforts for the Horizon Lateral project are ongoing. Final design is anticipated to commence in 2023 with construction procurement in 2024. The Project will strengthen one of America’s most reliable water systems by providing continued, reliable water service to existing and future customers through a new conveyance system designed to deliver up to 375 million gallons per day (mgd) to the southern portions of the Owner’s service area. Various facilities were identified for the Project, including open trench excavation and 7-10 miles of 108-inch, or larger, diameter tunnels in both remote and heavily developed areas. Depending upon which alignment is chosen, the tunnels will traverse volcanic rock or soft ground materials in or around the McCullough Range and the surrounding alluvial basin.

Post-Bid

Water / Sewer

$1,824,400.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
441
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2022

January 1, 2024

img_map_placeholder

To Be Determined, Las Vegas, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.