BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Fontana, California. Completed plans call for site work for a municipal facility.

Online Q&A Yes Q&A Deadline 02/22/2022 2:00 PM (PST) The City of Fontana is soliciting bids for Walnut Village Iron Fencing Removal and Installation Project. In the event the City exercises its options, all terms, conditions, and provisions of the original contract shall remain the same and apply during the extension period, unless otherwise mutually agreed to in writing by both parties. Rates will be held for the duration of this contract. Adjustments shall be made in accordance with City Policy at the time of application. The contractor is responsible for trimming or removing any plant material, trees, and anything else that is in the way of the removal of the existing fence and includes the installation of new fence. Contractor must regrade areas where the new fence will be installed to obtain a flat surface in order to achieve the minimum requirement gap between the new fence and the finish grade. Contractor must install 12" by 18" "No Trespassing Signs" every 40 feet similar to the one included in these specifications. Contractor to install a no parking signs at all access gates. Contractor must submit sample of the signs for City approval. The materials and service list is not exhaustive and additional materials and services may be requested from the Contractor at any time during the contract period for new materials, installation, maintenance, repair and service. Material pricing must be all inclusive and include all items; such as, tax and shipping. All pricing will include labor, equipment, tools and incidentals per Green Book standards. Liquidated Damages : $500.00 for each and every calendar day of delay beyond the Performance Time or beyond Milestones Pre-Bid Meeting : No

Award

Municipal

$449,526.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
117
Bidding Soon
2,195
All Active Projects
1,047
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2022

March 24, 2022

img_map_placeholder

Multiple Locations, Fontana, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.