BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a power facility in Church Rock, New Mexico. Conceptual plans call for site work for a power facility.

To plan, design and construct Powerline to (**) clients within the Churchrock Chapter. Powerline construction will be coordinated with Continental Divide Electric Cooperative, Inc. and the Navajo Nation Capital Projects Management. The project will secure easements/ROW, archaeological and environmental studies, to plan, design, construct powerline extensions for households in the Tohajiilee Community, Bernalillo County. Phase I will consist of the planning/design, archaeological and environmental studies, easement/ROW and powerline construction for five homes. Phase II consists of the powerline construction for the homes. Continental Divide Electric Cooperative, Inc. will operate and maintain the line after construction through an MOU. The fiscal agent is the Navajo Nation. The project is included in the 2023-2027 Capital Improvement Program (CIP). As of April 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Power Plant

$300,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
6
Bidding Soon
57
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2023

Project location map

To Be Determined, Church Rock, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.