BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 20, 2022 at 8:00 PM

Updated September 1, 2023

Renovation of a transportation facility in Portland, Oregon. Completed plans call for the renovation of a transportation facility.

Western Terminal Expansion being performed for The Port of Portland ("Owner") requests sub-bid proposals for Bid Package #26.1 - Masonry, Metals, Millwork, Painting & GS Well Bldgs. ONLY qualified bidders, certified by either the State of Oregon's Certification Office for Business Inclusion and Diversity (COBID) or the Washington State Office of Minority & Women's Business Enterprises (OMWBE) are eligible for this work. Elaborate proposals or the inclusion of non-essential information e.g. marketing/promotional material, etc. is strongly discouraged. Proposals that are materially incomplete, are directed to other locations or received after the bid deadline will not be considered. Bidders must be properly licensed with the Oregon Construction Contractors Board at the time of bid. Bidders are required to file a $30,000 Public Works Bond with the CCB in accordance with ORS 279C.836 EXCEPT exemptions allowed under paragraphs (7) or (8) will not be permitted. Due to the scheduled start of the work, the $30,000 Public Works Bond must be on file with the CCB at the time of bid. This is a prevailing wage project. Bidders must comply with requirements of the prevailing wage law in ORS Chapter 279C. Refer to proposal documents for complete proposal requirements and additional information. This Project has a Small Business Enterprise (SBE) aspirational goal of 20%, of which 8.5% shall be minority owned businesses. Small Business Enterprises (SBE) are defined as for-profit small businesses that be been certified by either the State of Oregon's Certification Office for Business Inclusion and Diversity (COBID) or the Washington State Office of Minority & Women's Business Enterprises (OMWBE). Prime-tier Subcontractors that are not certified firms will have the same goal to utilize lower-tier SBE's for 20% of construction costs, of which 8.5% shall be minority owned businesses. Contractor is an equal opportunity employer and request bids from all qualified firms. *Construction is underway and opening is scheduled for 2025. Total construction budget is $950,000,000.

Under Construction

Transportation Terminals

$950,000,000.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
3
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

March 28, 2022

Project location map

7000 NE Airport Way, Portland, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.