BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a road / highway in Swainsboro, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project includes the resurfacing of Wadley Coleman Lake RD for 3.4 miles from US HWY 1 to McGarrh Mill Pond Road, Old Keys Mill Pond Road for 5.0 miles from US HWY 80 to GA SR 221, Old HWY 57 (NON GDOT) from the US HWY 1 Bypass for 0.48 miles towards the Swainsboro City Limits, and full lane width deep patching of Griffin Ferry Road at various locations.

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
60
Bidding Soon
635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

April 1, 2022

Project location map

Multiple Locations, Swainsboro, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.