BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lakewood, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Question Acceptance Deadline 02/15/2022 05:00 PM MT. Questions are submitted online No The project includes the entire length of the Bear Creek Greenbelt, approximately 2.7 miles, from Wadsworth Blvd west to the Fox Hollow Golf Course. Generally the work entails the removal and replacement of the existing concrete trails and the addition of a crusher fines sidepath. The new concrete path will be 10' and some 12' width with a 6" depth, replacing the existing 4" x 8'-wide path. The crusher fines path width varies from 4' to 6' and includes some areas with chemically stabilized crusher fines material. Trail closures, detours, and project phasing require traffic control, barricades and extensive pedestrian detour signage. The project also includes the replacement of 2 pedestrian bridges over Bear Creek with new prefabricated, steel bridge structures, concrete abutments and walls, and riprap armoring. In addition, there are some minor modifications to the Estes St (vehicular) bridge where the trail passes under the roadway. Two concrete 'flanges' are to be removed from the abutment under the bridge. In this location the trail improvements require storm sewer and manhole work and concrete retaining walls and riprap armoring. The work scope includes a wildlife biologist to assess the area for nesting raptors prior to disturbance. In addition, extensive erosion control BMPs, construction fencing, seeding, erosion control blankets, planting of trees and wetland poles and stakes is included. The project is to be completed within Eighteen (18) months from the date of the Notice to Proceed. Buyer's Requirements Participation Requirements - Minority Business Participation - Small Business Participation - Women-Owned Business Participation - Service-Disabled Veteran Owned - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Insurance Required - Contractors License Required - Prevailing Wage Required - Federally Funded - Certified Payroll Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The project is to be completed within Eighteen (18) months from the date of the Notice to Proceed.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
1,005
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 28, 2022

img_map_placeholder

Bear Creek Greenbelt Trail, Lakewood, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.