BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Salt Lake City, Utah. Completed plans call for the renovation of a municipal facility.

Liquidated Damages: $1,000.00 All documents should be attached as separate files. For questions relating to U3P, please email sciquestadmin@utah.gov. The Contract will be awarded as soon as possible to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and acceptable prioritized alternates, provided the bid is reasonable, is in the interests of DFCM to accept and after applying the Utah Preference Laws in U.C.A. Title 63, Chapter 56. DFCM reserves the right to waive any technicalities or formalities in any bid or in the bidding. Alternates will be accepted on a prioritized basis with Alternate 1 being highest priority, Alternate 2 having second priority, etc. Alternates will be selected in prioritized order up to the construction cost estimate. DFCM reserves the right to reject any or all Bids. All of the VAV box controllers, related network equipment, VAV reheat valves, perimeter heating valves shall be upgraded to a new Niagara N4 system. This upgrade will include a local control server as well. All remaining pneumatic controllers for large CHW / HW valves shall be upgraded to electronic valves as part of this project. Project also includes rebuilding the existing 400 ton Trane chiller. The performance and payment bonds shall be for an amount equal to one hundred percent (100%) of the contract sum and secured from a company that meets the requirements specified in the requisite forms. Any bonding requirements for subcontractors will be specified in the Supplementary General Conditions. A bid bond properly signed by the contractor and a qualified surety, on the AIA Document A310 - 2010 Bid Bond, or equivalent, in the amount of 5% of the bid, shall accompany the bid submission and uploaded in U3P. If the bid bond is not furnished with the bid through U3P, the BID is nonresponsive. Question Submission Close Date 2/9/2022 3:00 PM MST 1. Furnish all labor, materials, and equipment necessary for the completion of the mechanical scope of work. 2. Furnish and install all motors specified in this Division and be responsible for the proper operation of electrical powered equipment furnished by this Division. 3. Furnish exact location of electrical connections and information on motor controls to Division 26. 4. Mechanical Contractor shall obtain the services of independent Test and Balance Agency. 5. Placing the air conditioning, heating, ventilating, and exhaust systems into full operation and continuing their operation during each working day of testing and balancing. 6. Making changes in pulleys, belts, and dampers, or adding dampers, as required for the correct balance as recommended by Balancing Contractor at no additional cost to Owner. 7. The satisfactory performance of the completed systems is a requirement of this specification.

Award

Municipal

$2,334,971.00

Public - State/Provincial

Renovation

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
72
Bidding Soon
1,022
All Active Projects
407
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 17, 2022

April 18, 2022

August 31, 2022

img_map_placeholder

450 S State St, Salt Lake City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.