BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Fort Myers, Florida. Completed plans call for the renovation of a transportation facility; and water / sewer project.

Question Cutoff Date: 2/2/2022 05:00 PM (ET) Mobilization costs indicated on the bid form will include the costs for all insurance requirements, project signs and the successful bidder's mobilization and demobilization. Mobilization costs will not exceed 10% of the total contract cost unless the successful bidder can provide to the Authority that its actual mobilization costs exceed 10%. Note Florida Trench Safety Act (90-96) will apply to this project. The successful bidder must put the Lift station wet well on bypass pumping for the duration of the project to keep local businesses and sewer working until the lift station rehabilitation is completed in accordance with these specifications and accepted by the Authority. Bypass pumping must be equipped with a 24-hour telemetry monitoring system. In the event of an issue, the successful bidder is required to provide immediate response and address all issues to the satisfaction of the Authority within 24 hours from the time successful bidder received notification of the issue. Payment for all work included in the bypass pumping bid item will include compensation for connections, labor, bypass pumps, temporary electric, temporary piping, fittings, restraints, excavation, dewatering backfill, compaction, and the bypassing of the existing lift station in order to complete the proposed improvements. Minimum 1/4 '' stainless steel (316) lifting chains with stainless steel 5/16'' shackles are required for pumps at time of installation, or as required by the pump assembly weight. Install a new 2'' 304 stainless steel guide rail system with 304 stainless steel upper guide brackets to accommodate selected pump and rail system. 4'' 150lb. standard ANSI flange pump discharge and base system required for lift station application. Install four new Roto type heavy duty Anchor Scientific Stainless Steel normally opened float switches (internally weighted) with heavy duty six hook SS cable and float rack. Lengths to be determined by the successful bidder on site.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
59
Bidding Soon
1,138
All Active Projects
501
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2022

March 10, 2022

March 18, 2022

img_map_placeholder

11000 Terminal Access Rd, Fort Myers, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.