BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bainbridge, Georgia. Completed plans call for site work for a water / sewer project.

All prices quoted shall be firm for a period of 30 days from bid opening. The City of Bainbridge requires a minimum of 30 days to make payment to successful vendor after receipt of goods. However, cash discounts for early payment will be taken into consideration. If such a discount is available, please note this in your bid proposal The City of Bainbridge reserves the right to accept or reject any part of or all bids, and to waive technicalities or formalities in bidding, and the right to negotiate with the low bidder to reach a final contract, and to accept the bid deemed to be in the best interest of the City. SCOPE OF WORK Perform services to clean out the existing storm water detention pond at the corner of Loop Avenue and Douglas Drive (Parcel B053A07A00). The pond is approximately 1.2 acres in size. THE PROJECT CONSISTS OF, BUT IS NOT LIMITED TO THE FOLLOWING MAJOR ELEMENTS: The removal of all trees and vegetation and undergrowth within the fenced area of the pond itself, the restoration of the pond to its original condition through the removal of excess sediment that may have accumulated, general cleanup of the pond itself and proper disposal of all materials removed

Award

Water / Sewer

$14,250.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
25
Bidding Soon
387
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2022

March 14, 2022

img_map_placeholder

Douglas Dr & Loop Ave, Bainbridge, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.