Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Champlin, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of April 19, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May of 2022. *The closed solicitation has been included below for reference: The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities. 33,000 S Y Remove Bituminous Pavement 16,000 S Y Full Depth Reclamation 24,000 L F Remove and Replace Concrete Curb and Gutter 34,000 C Y Excavation - Common (P) 18,000 C Y Select Granular Embankment (CV) (P) 5,000 TON Type SP 12.5 Wearing Course Mix (2,C) 6,200 TON Type SP 12.5 Non Wear Course Mix (2,C) 22,000 S F 4" - 6" Concrete Walk 32,000 S F 3" Bituminous Walk 19,000 L F 4" - 6" PVC Pipe Drain 5,000 L F 12" - 36" RCP Storm Sewer 12,000 L F Fiber Optic Trunk Cable 12SM-48SM 52,000 L F Underground Wire 1/C 8 AWG 3,000 S F Crosswalk Multi Comp. The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract. All bidders and persons or companies providing a response/submission to the Advertisement for Bids of the City of Champlin shall comply with the provisions of the statute. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation. No Bid may be withdrawn for a period of 60 days. Immediately following expiration of the time for receiving bids, representatives of the City of Champlin will publicly view Bids at an online Bid opening meeting. Information and Bidding Documents for the Project can be found at Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from other sources.
Bid Results
Roads / Highways
$6,056,824.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 23, 2022
May 2, 2022
Multiple Locations, Champlin, MN
Related To This Project
Champlin, MN
Bid Date: May 05 2022
Champlin, MN
Bid Date: Nov 12 2021
Champlin, MN
Bid Date: Jan 04 2023
Champlin, MN
Bid Date: Aug 02 2022
Champlin, MN
Bid Date: Sep 25 2019
Champlin, MN
Bid Date: Jan 26 2023
Champlin, MN
Bid Date: Feb 06 2023
Champlin, MN
Bid Date: Dec 07 2022
Champlin, MN
Bid Date: Oct 03 2018
Champlin, MN
Bid Date: Apr 02 2019
Champlin, MN
Bid Date: Feb 18 2020
Champlin, MN
Bid Date: May 21 2019
Champlin, MN
Bid Date: Jan 07 2020
Champlin, MN
Bid Date: May 19 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.