Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Clinton, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This will address a number of roadways scattered across town. Most of the roadways have a solid sturdy base and will require an overlay or a mill and overlay. There are a few isolated incidents of ADA ramp construction. As with most HMA projects, there will be necessary manhole, catch basin and water valve adjustments. The following is a comprehensive list of the HMA surface restoration associated with this project: -Beaver Channel Parkway (0+00-48+04), Mill Creek to west of South 14 th Street. Two Inch (2") Overlay, 1231 Tons -South 12th Street (48+04-61+22.45), 15th Avenue South to 11th Avenue South, Three Inch (3")Overlay, 950 Tons -South 32nd Street (61+23-123+95), 2nd Avenue South to Mill Creek, Four Inch (4")Cold-in-Place, Three Inch (3") HMA Overlay -South 32nd Street (125+52-129+69.94), Mill Creek to Valley Oaks, Profile Mill and Three Inch(3") Overlay, 2946 Tons (total for South 32nd Street) -Riverview Drive (129+70-181+75), 9th Avenue North to 6th Avenue South, Four Inch (4")Cold-in-Place, Two and One-Half Inch (2.5") Overlay, 2989 Tons. -Rolling Meadows (Tower Road, 33rd Avenue North and 34th Avenue North) (201+60-234+26),Three Inch (3") Mill and Overlay, 1766 Tons In addition to the listed HMA resurfacing in the above list, South 12 th Street will also require ADA sidewalk replacement, as well as some concrete patching. Riverview Drive will require some sidewalk adjustments, as well as curb patching. Rolling Meadows has four (4) ADA ramps to be replaced, as well as curb patching. South 32 nd Street will require new pavement markings and rumble strips. Additionally, we will be replacing the HMA approaching the concrete bridge, which will amount to Two Hundred Three square yards (203 SY) of Six Inch (6") HMA on Twelve Inches (12") of Rock Base. The last piece of the project is the reconstruction of the 200 block of 28 th Avenue North between North 2 nd Street and Pershing Blvd. The project will fully remove the existing surface, curb and sub-base. These removals will be replaced with a newly constructed roadway, Five Hundred Seventy Four square yards (574 SY) of Six Inch (6") HMA, Twelve Inch (12") of subbase and Thirty Inch (30") curb and gutter. This portion of the project will also require two (2) new ADA ramps. Because of the steep banks on the north side, the courtesy steps will require replacement with less than three (3) steps each. The above work shall be commenced as soon as possible after the contract and bond have been approved by the City Attorney and have been signed by the Mayor and City Clerk. The notice to proceed for this project shall be issued on or before May 31, 2022. The early start date shall be June 1, 2022. The late start date shall be July 11, 2022. The contractor will have eighty (80) working days for substantial completion of this project. Substantial completion date is October 31, 2022. All seeding and punch-list items shall be completed by November 30, 2022. Liquidated damages shall be per Special Conditions. Each Bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a Contract for the work bid upon and will furnish after the award of Contract a corporate Surety Bond, in a form acceptable to the City of Clinton, for the faithful performance of the Contract, in an amount equal to one hundred percent (100%) of the amount of the Contract. The Bidder's security shall be in the amount fixed in the Instructions to Bidders and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a Bid Bond on the form provided in the Contract Documents with corporate Surety satisfactory to the City of Clinton. The bid shall contain no condition except as provided in the specifications. Bids are to be on a Bid form furnished by the City and must be submitted in a sealed envelope with the name of the bidder endorsed on the outside, and state that it contains a bid on "Asphalt Street Rehabilitation, Project G-2022" and must be accompanied, in a separate envelope, by a bid bond on a form provided by the City, or a cashiers or a certified check, drawn on an Iowa bank or a bank chartered under the laws of the United States, payable to the "City Clerk of the City of Clinton, Iowa", in the amount of five (5) percent of the bid as security that the bidder whose proposal is accepted will enter into a contract for the above, and will provide the required bonds, with sureties to be approved by the City Council, which respective sum will be retained by the said City as agreed liquidated damages in case the successful bidder fails to enter into a contract within ten (10) days after award of the contract and post bond satisfactory to the City insuring the faithful fulfillment of the contract and maintenance. The City of Clinton reserves the right to defer acceptance of any bid for a period of thirty (30) calendar days after receipt of bids and no bid may be withdrawn during this period. Each successful Bidder will be required to furnish a corporate Surety Bond in an amount equal to one hundred percent (100%) of its Contract price. Said Bond shall be issued by a responsible Surety approved by the City of Clinton and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained and shall guarantee the prompt payment NB-4 of all material and labor, and protect and save harmless the City of Clinton from claims and damages of any kind caused by the operations of the Contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two (2) years from and after acceptance of the Contract. The City of Clinton will issue a sales tax exemption certificate to the Contractor for all material purchased for incorporation into the project. Tax exemption certificates are applicable only for the specific project for which the tax exemption certificate is issued. The Contractor also must file appropriate Chapter 573 claim/lien waivers before final payment will be released. The City of Clinton does hereby reserve the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City.
Award
Roads / Highways
$1,339,994.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2022
March 17, 2022
Multiple Locations, Clinton, IA
Related To This Project
Clinton, IA
Bid Date: Apr 08 2020
Clinton, IA
Bid Date: Nov 01 2018
Clinton, IA
Bid Date: Dec 21 2023
Clinton, IA
Bid Date: Feb 23 2022
Clinton, IA
Bid Date: Mar 15 2022
Clinton, IA
Bid Date: Mar 10 2022
Clinton, IA
Bid Date: Oct 29 2021
Clinton, IA
Bid Date: Feb 15 2022
Clinton, IA
Bid Date: Jan 20 2022
Clinton, IA
--
Clinton, IA
Bid Date: Dec 14 2021
Clinton, IA
Bid Date: Dec 14 2021
Clinton, IA
Bid Date: Dec 08 2021
Clinton, IA
Bid Date: Nov 16 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.