BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lake Forest, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Category Code: Paving (Parking Lot Paving) Description: The Waveland Park Parking Lot portion of the project includes the expansion and resurfacing of the existing parking lot, to include earth excavation, aggregate base course, preparation of base, bioswale, HMA binder and surface course, site grading, and restoration. The Forest Ave Parking Lot portion of the project includes milling off the existing asphalt surface, removal and replacement of deteriorated sections of sidewalk and curb, storm sewer upgrade, repaving, and restriping. Additonal Description: There are two projects in this bid. Each project has its own unique schedule and completion date. Site Directions: Two Separate locations are as follows: 1. Waveland Park Parking Lot Located adjacent to(just south of) 520 S Butler Dr., Lake Forest IL. 60045 2. Forest Ave Parking Lot Located adjacent to (just north of)673 N Oakwood Ave, Lake Forest IL. 60045 Bidder agreesthat the Forest Avenue Parking Lot portion of this work has a start date of Monday August 8, 2022 and will be substantially complete by Friday August 26, 2022 as provided in Paragraph 2.03 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions by Friday September 2, 2022 Bidder agrees that the Waveland Park portion of this work has a start date of July 11, 2022 and will be substantially complete by August 12, 2022 as provided in Paragraph 2.03 of the General Conditions, and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions by August 19, 2022. The City of Lake Forest is accepting electronic bids for the Waveland Park & Forest Avenue 2022 Parking Lot Improvements Project. The Waveland Park Parking Lot portion of the project includes the expansion and resurfacing of the existing parking lot, to include earth excavation, aggregate base course, preparation of base, bioswale, HMA binder, and surface course, site grading, and restoration. The Forest Ave Parking Lot portion of the project includes milling off the existing asphalt surface, removal and replacement of deteriorated sections of sidewalk and curb, storm sewer upgrade, repaving, and restriping.

Award

Sidewalks / Parking Lot

$377,272.00

Public - City

Paving, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
408
Active Projects
243
Bidding Soon
3,773
All Active Projects
1,520
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 10, 2022

July 11, 2022

September 2, 2022

img_map_placeholder

Multiple Locations, Lake Forest, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.