BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2022 at 7:00 PM

Updated November 15, 2023

Site work, renovation and addition to a municipal facility in St George, Utah. Conceptual plans call for the addition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

This is for the procurement of A/E services for DSU utility tunnel expansion, including upsizing existing piping and adding cooling capacity for future growth. Project scope includes/but may not be limited to the following Add new cooling tower(s) to support cooling needs for additional campus buildings Will require expanding the existing enclosure where the current cooling towers are located Size new piping to support future construction of buildings and expansion. Study/anaylsis to be performed to confirm what capacity is needed to support future growth Demo of existing piping to upsize for new needs. Extend utility tunnel with piping. Shoring or sloped excavation for new tunnel Demo asphalt and landscaping area, restore to previous state after tunnel is completed. CONSTRUCTION BUDGET: $2,676,500.00 Question Submission Close Date 2/14/2022 3:00 PM MST The method of contractor selection has not been determined at this time.

Conceptual

Municipal

$2,676,500.00

Public - State/Provincial

Addition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
145
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

Project location map

225 University Ave, St George, UT


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.