BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2025 at 8:00 PM

Updated April 11, 2025

Site work for a water / sewer project in Plano, Texas. Conceptual plans call for site work for a water / sewer project.

Update: Replace/parallel the existing 10/12/15/18/21-inch line along Spring Creek between Asaro Plaza and West Spring Creek Parkway with a 15/18/21/24-inch wastewater line. Replace the existing 21/24-inch line along Spring Creek between West Spring Creek Parkway and Pleasant Valley Drive with a 27-inch wastewater line. Additionally, an extension will be shown near Legacy Drive and Marchman Way to realign the existing 8-inch line with a 270-degree bend. Project is included City of Plano Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update : http://tinyurl.com/4fhamy4b Replace/parallel the existing 10/12/15/18/21-inch line along Spring Creek between Asaro Plaza and West Spring Creek Parkway with a 15/18/21/24-inch wastewater line. Replace the existing 21/24-inch line along Spring Creek between West Spring Creek Parkway and Pleasant Valley Drive with a 27-inch wastewater line. Additionally, an extension will be shown near Legacy Drive and Marchman Way to realign the existing 8-inch line with a 270-degree bend. Project is included City of Plano FY 2023-2028 Page No 782 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Replace/parallel the existing 10/12/15/18/21-inch line along Spring Creek between Asaro Plaza and West Spring Creek Parkway with a 15/18/21/24-inch wastewater line. Replace the existing 21/24-inch line along Spring Creek between West Spring Creek Parkway and Pleasant Valley Drive with a 27-inch wastewater line. Additionally, an extension will be shown near Legacy Drive and Marchman Way to realign the existing 8-inch line with a 270-degree bend. As November 01, 2022, this project is currently in the FY 2022-2023 Budget. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025-26. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025-26. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$17,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
400
Active Projects
177
Bidding Soon
3,959
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.