BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Berry Creek, California. Contact the soliciting agency for additional information.

Award Details Contract Award Date: Jun 15, 2022 Contract Award Number: 12363N22C4011 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: P24SM413GKQ5 Contractor Awarded Name: HIGH SIERRA TREE CO INC Contractor Awarded Address: Auburn, CA 95602-8343 USA Base and All Options Value (Total Contract Value): $2725315.00 Background: This project was previously synopsized and solicited as Berry Brush Stewardship IRSC (Fire Salvage) - Solicitation #12363N22Q4021. The solicitation was cancelled on 4/26/2022 due to receipt of price quotes that significantly exceeded the funds budgeted for the project. Further, it was determined that the solicitation needed restructured to ensure that the highest priority work would be completed. Description of Work - The Berry Brush Stewardship IRSC Revised shall be awarded under Stewardship Authority authorized by Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014. This law grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. The project aims to restore forest health, treat hazardous fuels along and adjacent to roads within the North Complex Fire of 2020 and reduce the future risk of high severity wildfire. To accomplish these objectives, the contract includes the following requirements: Mechanically remove unmerchantable trees and small diameter hazardous fuels along roadsides to landings to be later burned by FS or chipped/removed from contract area. Deck merchantable logs for possible removal. Improve watershed condition through performance of specified road work. Cut roadside hazardous fuels and leave in place or pile if awarded. Cut and pile hazardous fuels within interior units if awarded. Remove product per Timber Subject to Agreement if awarded. Project Location- T 21N R5E Sections 12-14,22,24,30; T 21N R6E Sections 4-9,18-19,30; T22N R6E Sections 28,32-33, Butte County, CA. Brush Creek, CA is located 25 miles from Oroville, CA via Oro-Quincy Highway (Highway 162). See Vicinity Map and Contract Area Map for details. Two site visits were held in relation to the original solicitation. The site visit notesfor these meetings have been provided as attachments. No further organized site visit is planned at this time. Mandatory Items 1-8 (Road Reconstruction) and Item 9 (Roadside Hazardous Fuel Treatment are required to be completed by 10/31/2023. Optional Items 10-12 if awarded are required to be completed by 10/31/2024. Optional Item 13 is required to be completed by 10/31/2025 if awarded. No product removal is mandatory under this solicitation. Removal of Timber Subject to Agreement shall be priced and quantified under Optional Item 14 only if the contractor elects to quote this item. If awarded, the deadline for product removal would follow the deadline applicable to each respective Item. Solicitation was Amended on 5/24/2022 to strike two clauses from the solicitation. This change is immaterial and taken in response to an update to USDA regulations; therefore, formal acknowledgement of the amendment is not required. Solicitation was Amended for a second time on 5/31/2022 to correct the Optional Item 11 Descriptions throughout the solicitation. As correctly specified in Appendix A, this work activities requires Cutting and Piling only. Descriptions originally indicated cut, skid, deck and pile by mistake. Further, the size standard for 115310, Fuels Management Services, was updated to $30 Million to align with the new Small Business Administration Table of Size Standards issued 5/2/2022. Quoters are required to acknowledge this material amendment. The deadline for receipt of quotes has been extended by 1 day to 6/3/2022 at 3:00 PM PST.

Award

Roads / Highways

$2,725,315.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
62
Bidding Soon
986
All Active Projects
426
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 3, 2022

July 4, 2022

November 1, 2023

img_map_placeholder

Oro Quincy Hwy, Berry Creek, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.