EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 30, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Reading, Pennsylvania. Completed plans call for site work for a water / sewer project.

The City of Reading will receive proposals for the Heritage Park Outfall Project submitted electronically via the PennBid Program. Each proposal shall be accompanied by bid surety in the amount of ten percent (10%) of the proposal. A certified check or bid bond will be accepted. Attention is called to the fact that prevailing minimum wage rates are a provision of this contract. Employees shall not be discriminated against because of race, color, age religion, sex or national origin. The City of Reading reserves the right to accept or reject any or all bids, and to accept or reject any part of a bid that may not be in the public interest. Bid security, in the amount of ten percent (10%) of the bid price shall accompany each proposal. This bid security may be a Certified or Cashier's Check, or a bid bond furnished by a surety company, satisfactory to the City of Reading. The Contractor shall furnish a performance bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract and also a labor and material payment bond in an amount not Less than one hundred percent (100%) of the Contract Sum as security for the payment of persons performing labor on the Project under this Contract and furnishing materials in connection with this Contract. The successful bidder, upon award of contract, shall furnish at the time of execution of the same, a Maintenance Bond by a surety company acceptable to the City of Reading, in an amount equal to one hundred percent (100%) of the contract, to guarantee satisfactory performance. All bonds are subject to approval by the City Solicitor. The Contractor shall do any work not herein otherwise provided for which, in the opinion of the Engineer, is necessary for the proper completion of the work, but not such work will be allowed or paid for except on a written order of the Engineer, and there shall be no claim for extra work or materials or for damage sustained except under this Article. The extra work order issued by the Engineer shall specify the basis of payment for the extra work. Any extra work or changes in the work involving changes in the plans and/or specifications shall be approved by the applicable Director, prior to the execution of the work. In case the contract is awarded to a bidder who fails to enter the contract or to deliver all required bonds and affidavits, the cash or check deposited shall become absolute property of the City; or if a bond has been deposited, it shall become payable immediately. Cash, checks or bonds deposited will be returned to unsuccessful bidders as soon as the contract is awarded, or all bids rejected. The City is not subject to federal, state or local sales or use tax or federal excise tax. Contractor hereby assigns to City all of its rights, title, and interest in any sales or use tax which may be refunded as a result or the purchase of any materials purchased in connection with the contract and contractor, unless directed by City, shall not file a claim for any sales or use tax refund subject to this assignment. Contractor authorizes City, in its own name or the name of contractor, to file a claim for a refund of any sales or use tax subject to this assignment.

Award

Water / Sewer

$482,250.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

118 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
167
Bidding Soon
2,358
All Active Projects
1,079
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 18, 2022

img_map_placeholder

601 Canal St, Reading, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Heritage Park Outfall Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.