BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Anchorage, Alaska. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of June 29, 2022, project received no bids. No definite date of rebid. Questions Due: 5:00 P.M. Local Time, June 9, 2022 Consisting of removal and replacement of an underground fuel storage tank, removal and replacement of existing underground fuel lines, installation of new fuel dispensing station and electrical/mechanical lines and controls, installation of fuel pumps, removal/replacement of the concrete slab over the underground fuel tanks, installation of a new concrete slab at the new fueling dispenser, removal/replacement of pavement/sidewalk/curb & gutter, installation of sheet piles during construction, re-grading the site, import of structural section shown on the Drawings, installation of one concrete island with steel forms, removal/replacement of bollards/signs, installation of traffic markings, design/installation of a canopy/canopy pile foundations, installation of curb ramp, installation of storm drain pipe to connect to proposed canopy roof drain, connection to existing storm drain system, excavation/disposal of contaminated soil, dewatering contaminated groundwater and other miscellaneous items as shown on the Drawings. ESTIMATED CONSTRUCTION COST: Between: $500,000 - $1,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding forty-five (45) days from the time of the opening. All work shall be completed within 500 calendar days after receipt of Notice to Proceed

Final Planning

Water / Sewer

$1,500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

December 30, 2022

Project location map

3701 Doctor M.L.K. Jr Ave, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.