BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Fox Lake, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

As of December 14, 2023, per owner, an engineer and contractor have been selected. Work began in November 2023 and will continue until Mid-2025. STATE OF ILLINOIS LAKE COUNTY DIVISION OF TRANSPORTATION 600 W. WINCHESTER ROAD LIBERTYVILLE, ILLINOIS Notice is hereby given that Statements of Interest, SOI, are requested together with Statements of Qualifications, SOQ, for furnishing professional civil engineering services on the following projects. 2. Section No. 10-00279-01-CH: Phase III construction engineering for the Illinois Route 59 at Grand Avenue/Washington Street intersection improvements in Fox Lake, Illinois. This 1.37-mile project involves staged asphalt pavement reconstruction and widening to provide through lanes, left turns on three legs and right turn on one of the legs at Grand as well as a new intersection with Washington Street/Grant High School Access to provide through lanes, left turn lanes and right turn on one of the legs. Features include full depth hot-mix asphalt, HMA, pavement, HMA widening and resurfacing, block retaining wall, new traffic signals, lighting, multi-use path and sidewalk. Major work to inspect includes earthwork, storm sewers, HMA paving, concrete items, landscaping, electrical and utility coordination. This project will be administered by LCDOT using IDOT and local procedures. A Designated Erosion Control Inspector, DECI, will need to be part of the project staff. Asphalt and concrete QA will be covered by LCDOT staff, but soils may require a sub-consultant. Construction layout will be by the contractor. Coordination with IDOT, village, school, residents and local businesses will be needed for their facilities and general job progress. Coordination will be necessary with relocating utility companies. Communication with stakeholders over this one season plus a following spring project will be done through development of a project website and a pre-construction open house meeting that will likely need to be virtual. The SOQ should be concise and directly related to the project, including identification of the proposed project team as well as similar projects or studies that have been complete with comparable scope of work. A current IDOT prequalification listing shall be included with the submittal. The SOI shall be limited to 1 page and the SOQ shall be limited to 3 pages per project. A minimum of three firms will be selected as the most qualified from their SOI/SOQ submittal to make a presentation to the selection committee likely via Teams or Zoom. The basis of evaluation for projects 1, 2 & 3 will all be 20% technical approach, 10% firm experience, 10% specialized expertise, 20% staff capabilities, prime/sub, 10% workload capacity, 20% past performance and 10% local presence and for projects 4 & 5 will be 25% technical approach, 15% firm experience, 10% specialized expertise, 15% staff capabilities, prime/sub, 15% workload capacity, 10% past performance and 10% public outreach experience. The County, in accordance with the laws of the State of Illinois, hereby notifies all firms expressing statements of interest that it will affirmatively ensure that the contract entered into pursuant to this advertisement will be awarded without discrimination on the grounds of race, color or national origin.

Under Construction

Roads / Highways

$1,400,000.00

Public - County

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
100
Bidding Soon
2,137
All Active Projects
923
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2023

img_map_placeholder

Illinois Rte 59, Fox Lake, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.