Renovation of an educational facility in Quebec, Quebec. Completed plans call for the renovation of a educational facility.
Reference number : 1564964 Review Title : Replace the boilers / Ecole de l'Envol Deadline for receipt of complaints: 2022-02-11 Submission sent electronically accepted: Yes, in a single submission document Estimated value: $366,800 to $605,599 The Premi re-Seigneuries School Service Center wishes to retain the services of a construction contractor for the replacement of the boilers at its Envol school located at 120, 47 eme Rue Est Qu bec - G1H 2M2. The main works related to this project are: Works not limited to: Plumbing/Heating Plumbing/heating demolition Modification of water inlet and heating water supply Heating: boiler room work including boilers, pumps, accessories, valves and piping Heating: installation of new valves on the hot water radiators Hydronic network balancing Natural gas works Ventilation Demolition breakdown Modifications to ventilation systems, fans, coils, shutters, etc. Air conditioning / refrigeration (rooms 005 and 007) Balancing Automatic regulation Demolition checks Construction controls: mechanical room Construction controls: heating valves and probes Construction controls: CO2 sensors, ventilation control Construction controls: leak detection system Operator Interface Programming Plumbing/ventilation insulation Plumbing / heating / ventilation insulation Electricity Electrical demolition Distribution / connections of mechanical equipment Power supplies for new controllers (junction boxes) Architecture Architecture demolition Asbestos removal works Roofing works Carpentry Modifications to wrought metals (ladders, lintel, etc...) Fenestration, tympanum and glazing works New doors, frame and hardware Projection fireproofing Paint work Prefabricated mesh partition Roof fall protection Masonry work (closing opening and patching) Interior systems work (recessed ceiling) Dismantling and reinstallation of soundproof ceilings Cabinetwork (storage module) Preparation schedule ) From February 24, 2021 to April 29, 2022 Opening of submissions on 2021-02-24 Approval of the lowest bidder week February 28, 2022 Contract signature; between February 28, 2022 and March 11, 2022 Production of shop drawings for verification; beginning of March 2022 to April 22, 2022 End of the verification of the shop drawings; April 29, 2022 Presentation of the schedule for approval; week of April 18, 2022 Schedule for carrying out work on site L'ecole de l'envol is a special education school that requires taking organizational precautions! The mandated company must respect and adapt to all requests during the work. Period from 2022-05-02 to 2022/06/28 (presence of students) Intervention only in areas not frequented by students => boiler room & roof Work can be done during normal working hours. The work may also be done outside normal working hours, but coordination with the client will be essential. (Evening, night, weekend. No request for additional payment in connection with these hours will be accepted) Noisy work is generally prohibited so as not to affect the smooth running of school activities. The tolerance threshold will remain to be defined on site between the customer and the company if necessary. The systems linked to the school's ventilation must absolutely be functional. Period from 2022/06/29 to 2022/08/19 (no students present) Intervention in all areas of the school Work can be done during normal working hours. The work may also be done outside normal working hours, but coordination with the client will be essential. (Evening, night, weekend. No request for additional payment in connection with these hours will be accepted) Construction vacancies may be worked on but a waiver request must be made and approved by the CCQ. The ventilation systems must be operational at the end of this period. Intervention in all areas of the school Work can only be done in the evening, at night, on weekends . (No request for additional payment in connection with these schedules will be accepted) In order not to interfere with school activities, evening work will begin after 6:00 p.m. and will be done in coordination with the client. The circulation areas as well as the premises in the school must be clean and usable by the occupants before 5:00 a.m. the following morning. Weekend work will be done in coordination with the client and will start after 6:00 p.m. on Friday. The circulation areas as well as the premises in the school must be clean and usable by the occupants before 5 am on Monday morning. The contractor must ensure the cleanliness of the corridors and the classrooms before the arrival of the students. No shutdown of daytime ventilation systems will be permitted. Heating-related systems must be functional at the end of this period. From September 19 to 23, 2022, provisional acceptance and submission of end-of-site documents. (TQC, Service Manuals, Warranty Letters, ETC.) Bid Bond 10% is required. Performance and Material Bond 50% is required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Educational
$879,890.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 24, 2022
May 2, 2022
120 47e Rue E, Quebec, QC
Related To This Project
Quebec, QC
Bid Date: Mar 23 2022
Quebec, QC
Bid Date: Mar 24 2022
Quebec, QC
--
Quebec, QC
Bid Date: Mar 29 2022
Quebec, QC
Bid Date: Mar 29 2022
Quebec, QC
Bid Date: Sep 08 2021
Quebec, QC
Bid Date: Feb 28 2022
Quebec, QC
Bid Date: Mar 31 2022
Quebec, QC
Bid Date: Mar 31 2022
Quebec, QC
Bid Date: Jul 16 2021
Quebec, QC
Bid Date: Mar 15 2022
Quebec, QC
Bid Date: Mar 29 2022
Quebec, QC
Bid Date: Apr 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.