BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Northlake, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Sewer Inspection/Rehabilitation, Pavement - Marking, Sidewalks/Curbs/Gutters, Bituminous Patching, Street/Road Asphalt Resurfacing and Milling, Concrete Pavement, ADA Curb Ramps, Traffic Control, Fire Hydrant, Pavement Resurface and Rehabilitation, Landscaping, Stormwater Improvements, Erosion Control - Temporary, Televising Sewers, Street/Road Pavement Marking, Sewer and Water Construction, Sewer Re-Lining, Curbs, Concrete Pavement Removal, Street/Road Concrete Reconstruction. The proposed work is officially known as "2022 Capital Improvements Project" and further described as water main rehabilitation, cured-in-place water main lining, cured-in-place sewer lining, hot-mix asphalt pavement resurfacing, Portland cement concrete pavement reconstruction, pavement patching, concrete curb and gutter removal and replacement, Portland cement concrete sidewalk removal and replacement, spot repairs of storm and sanitary sewers, ornamental lighting, and landscape restoration all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL).

Bid Results

Roads / Highways

$5,893,651.00

Public - City

Paving, Site Work

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
118
Bidding Soon
1,851
All Active Projects
819
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2022

April 26, 2022

img_map_placeholder

Multiple Locations, Northlake, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.