Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 28, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a mixed-use development in Northlake, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Project ID:PO# 93511, Northlake Streets Fullerton First Environmental File ID: 21-8511 ADA Curb Ramps, Traffic Control, Roadway Pavement Markings, Sidewalks/Curbs/Gutters, Street/Road Asphalt Resurfacing and Milling. Description: The proposed work is officially known as "Fullerton Avenue Resurfacing Project" and further described as HMA surface removal, HMA Surface and HMA Binder courses, spot curb and gutter and spot sidewalk removal and replacement, driveway removal and replacement, detector loop removal and replacement, ADA improvements, pavement markings and landscape restoration all as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd (CBBEL). Description: This work shall consist of removal and replacement of existing pavement at locations as directed by the ENGINEER. This work shall be done in accordance with Section 442 of the STANDARD SPECIFICATIONS except that the four types, namely Type I, Type II, Type III and Type IV have been combined under the pay item CLASS D PATCHES, 6" (SPECIAL). The existing subgrade and pavement including the base and bituminous surface shall be removed to a depth of six (6) inches below the bituminous surface after the grind and replaced with 6" binder, as specified in Section 406. The surface of the patch shall meet the surface of the existing bituminous surface after the grind. No patch shall be left open for more than 24 hours
Bid Results
Roads / Highways
$384,176.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2022
September 5, 2022
W Fullerton Ave, Northlake, IL
Related To This Project
Northlake, IL
Bid Date: Jul 06 2022
Northlake, IL
Bid Date: Jun 26 2023
Northlake, IL
Bid Date: Nov 29 2022
Northlake, IL
Bid Date: Feb 07 2023
Northlake, IL
Bid Date: Feb 27 2023
Northlake, IL
Bid Date: Feb 15 2023
Northlake, IL
Bid Date: Mar 24 2023
Northlake, IL
Bid Date: Mar 29 2023
Northlake, IL
Bid Date: Jun 17 2022
Northlake, IL
Bid Date: Nov 29 2022
Northlake, IL
Bid Date: Jan 10 2023
Northlake, IL
Bid Date: May 30 2023
Northlake, IL
Bid Date: Oct 25 2022
Northlake, IL
Bid Date: Feb 25 2022
Freeport, IL
Bid Date: Apr 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
