BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Peachtree City, Georgia. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

Equipment demolition/clean up 1) Remove damaged valve shaft (for 10-inch BFV) and pipe supports. 2) Removal of loose material from bottom of the riser structure. 3) Demolition of existing water level/valve panel (Turbotrol panel) and associated fixtures/conduits. Repairs 1) Construct new valve shaft and replacement pipe supports (stainless steel). 2) Repair valve shaft operator stand concrete base. 3) Ensure operation of existing BFV and gate valve. 4) Replace existing defunct AUMA Actuator with AUMA quarter-turn electric actuator (SQ.R10.2/AC01.2) with hand wheel operator or equal. 5) Connect power (existing power junction box) and control wiring (existing SCADA panel) to new actuator. 6) Replace 10" gate valve operator wheel. 7) Repair and/or replace riser access ladder (aluminum). 8) Installation of switch operated 200-watt LED marine flood light in riser. Building Work 1) Installation of varmint control for intake building - hardware cloth and/or flashing and/or soffit. 2) Installation of roof ridge vent. 3) Installation of metal exterior siding and flashing (beige). 4) Paint access door (clean, prime, paint with beige exterior acrylic latex). 5) Paint Interior walls (clean, prime, paint with white exterior acrylic latex). 6) Paint existing interior railing (clean and paint with direct to metal DTM acrylic paint). ADDITIONAL WORK Vendor shall coordinate with the representative of selected actuator manufacturer (Limitorque, | AUMA, or equal) and ensure manufacturer warranty is provided to FCWS. Vendor shall use JK Duren for integration of the new valve actuator into the SCADA system. The actuator shall be controlled by the Horner PLC in the existing control panel. The work shall include all necessary programming for the Horner PLC controllers at the Lake Kedron intake structure and the Crosstown WTP, and modification of the Wonderware HMI screens at the Crosstown Water Treatment Plant and the South Fayette Water Treatment Plant. SCADA control shall include valve open position (0 to 90 degrees) and/or percent valve open (0 to 100%), and status confirmation of valve position. Address any questions you may have about this request for quotes to Natasha Duggan via email to nduggan@fayettecountyga.gov or fax to (770) 719-5534. Questions will be accepted until 3:00 p.m., Friday, May 13, 2022.

Award

Water / Sewer

$103,850.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
60
Bidding Soon
1,561
All Active Projects
691
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2022

July 1, 2022

img_map_placeholder

616 Wingspread, Peachtree City, GA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.