BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Peachtree City, Georgia. Contact the soliciting agency for additional information.

The Peachtree City Water & Sewerage Authority will be receiving separate sealed Bids for all material, labor and equipment for the Annual Services Contract. Each Bidder must deposit with his bid, security in the amount of 5%, and shall be subject to the conditions provided in Section 00 21 13 Instruction to Bidders. Each Bidder is required to submit a Construction Contractors Qualification Statement, Bid Security, Bid Form, Non-Collusion Affidavit, and Security and Immigration Compliance Affidavit as outlined in Section 00 22 13 Supplementary Instructions to Bidders. The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids. The project shall be Substantially Complete within n/a calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of n/a per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within n/a calendar days beyond Substantial Completion. Liquidated Damagesshall be assessed in the amount of n/a per day for each calendar day required to achieve Final Completion. The Peachtree City Water & Sewerage Authority provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained by n/a. The Peachtree City Water & Sewerage Authority will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and State of Georgia Legal Holidays.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
191
Bidding Soon
2,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2022

September 26, 2022

Project location map

Multiple Locations, Peachtree City, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.