BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Momence, Illinois. Completed plans call for the renovation of a 11,300-square-foot educational facility.

The project consists of the replacement of approximately 11.300 sq. ft. of roof with a single ply membrane roof assembly Location- 801 W. Second Street Momence, IL 60954 On site mobilization to take place June lst.2022. All work must be completed by August 12, 2022. Complete the Work by the 15th day of August 2022. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. J. The successful Bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Payment Bond for the full amount of the bid accepted. 1. The Performance Bond and Labor and Material Payment form shall be AIA Document A3 111 - "Performance Bond" and AIA Document A311 - "Labor and Material Payment Bond". K. Refer to other bidding requirements described in Document 00 2113 - Instructions to Bidders and Document 00 3100 - Available Project Information. Momence CUSD #1 00 1113 - 1 ADVERTISEMENT FOR BIDS Momence Junior High - Roof Replacement Your offer will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. PREVAILING WAGES: Contractors will be required to comply with all laws, including those relating to prevailing rate of wages of the various classes of work to be performed under the proposed contract as determined by the Illinois Department of Labor, in accordance with Federal Labor Standards provisions. US Department of Labor. CRIMINAL BACKGROUDN CHECK: 1. A criminal background check shall be conducted on all on-site personnel pursuant to Illinois State Board of Education Fall 2012 Guidance Document for Criminal History Records Information Checks portal and shall be made available to the school district. Contractor shall include costs for criminal background checks for all project employees in their bids. The Owner reserves the right to accept or reject any or all offers. Electronic copies may be obtained free of charge

Bid Results

Educational

$303,726.00

Public - City

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
237
Bidding Soon
3,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2022

June 1, 2022

Project location map

801 W 2nd St, Momence, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.