BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Momence, Illinois. Working plans call for the construction of a 2,400-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

As of 10/20/2022, no bids were received. A timeline for the rebid of the project has not been established at this time. The project consists of the construction of an approximately 2.400 sq ft. engineered post wood frame storage building. Bids received after the stated time will not be accepted, and will be returned unopened. Submit your offer on the Bid Form provided. No partial sets will be distributed. Deposit checks will be returned to Bidders who return the contractor documents to the Architect in good conditions, within ten (10) days after the opening of bids. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount I. The successful Bidder will be required to furnish a satisfactory* Performance Bond and Labor and Material Payment Bond for the full amount of the bid accepted. 1. The Performance Bond and Labor and Material Payment form shall be AIA Document A3 111 - "Performance Bond" and AIA Document A311 - "Labor and Material Payment Bond". J. Refer to other bidding requirements described in Document 00 2113 - Instructions to Bidders. K. Your offer will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. L. PREVAILING WAGES: 1. Contractors will be required to comply with all laws, including those relating to prevailing rate of wages of the various classes of work to be performed under the proposed contract as determined by the Illinois Department of Labor, in accordance with Federal Labor Standards provisions. US Department of Labor. The Owner reserves the right to accept or reject any or all offers.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$300,000.00

Public - City

New Construction, Site Work

20

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
94
Bidding Soon
1,766
All Active Projects
797
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 17, 2022

img_map_placeholder

801 W 2nd St, Momence, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.