BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Monee, Illinois. Contact the soliciting agency for additional information.

Job No. P-91-023-22, I-57 Access Study from s/o Wilmington-Peotone Rd to n/o MoneeManhattan Rd, Phase I Engineering Project, Will County, Region One/District One. This project requires 18% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 27, 2022 at 1:00 PM at the Region One/District One Office in Schaumburg. Phase I engineering services are required for all work associated in the preparation of preliminary engineering and environmental studies to improve access to Interstate 57 from south of Wilmington-Peotone Rd to north of Monee-Manhattan Rd in Will County. The anticipated scope of work consists of improvements to meet 2050 travel demand in an area that has potential for large industrial and future airport uses by improving local and regional connectivity to Interstate 57. A key planning tool will include a public involvement program based upon the principles of Context Sensitive Solutions. The work will also include all related work necessary to complete a Combined Design Report and a Planning and Environmental Linkages study that may be processed as an Environmental Assessment. The Consultant's work may include, but is not limited to, data collection, traffic counts, crash analysis, survey, alternate geometric studies, location drainage studies, construction cost estimates, intersection design studies, traffic maintenance analysis, and all other work necessary to complete Phase I. The estimated construction cost for this project is $150,000,000. The completion date for this contract will be 36 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Location Design Studies (Reconstruction/Major Rehabilitation) Environmental Reports (Environmental Assessment) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. IDOT - 16 RFQ - I-57 Access Study from s/o Wilmington-Peotone Rd to n/o Monee Manhattan Rd, Phase I Engineering Project

Conceptual

Roads / Highways

$150,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
92
Bidding Soon
1,758
All Active Projects
788
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2022

img_map_placeholder

I-57, Monee, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.