BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Grand Rapids, Michigan. Completed plans call for the renovation of a educational facility.

As of April 6, 2022, the project was awarded to the following bidders: * Maintenance project was awarded to Modern Roofing - $261,000 * Roofing project was awarded to Van Doorn Roofing - $76,175 For a total awarded amount of $337,175. 2022 KCTC(Kent Career Technical Center) / Maintenance Building Roof Replacement Kent Intermediate School District (Kent ISD) is seeking proposals utilizing the OMNIA purchasing cooperative for Kent Career Technical Center (KCTC) and the Maintenance Building (MAINT) per specifications. Specifications are to be considered as minimums, and the general conditions, as listed, must be adhered to. Kent ISD will not consider or accept a bid received after the date and time specified for bid submission. Bids will be opened publicly immediately following the close of receiving bids. A Bid Security by a qualified surety authorized to do business in the state where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Personal checks are NOT acceptable. Bid may not be withdrawn for a period of sixty (60) days after the bid date. Successful Bidders may be required to furnish Surety Bonds as stated in the Project Specifications. A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Roof Area #1 KCTC - Section 32: a. Area of Roof(s): estimated 15,000 sq. ft. b. Description of Work: Restoration roofing specified in Division 07 Section 075600.13 Fluid-Applied Membrane Roofing, Insulated (AlphaGuard) 1) Complete roof diagnostic moisture survey to identify existing wet/defective insulation prior to start of project and provide to owner. 2) Remove existing wet/defective roof system components down to the structural metal deck and replace with like materials to match existing. 3) Clean roof using specified RoofTec cleaning service. 4) Apply Alphaguard WB Primer and allow to cure prior base coat application. 5) Apply Alphaguard BIO base coat at rate of 3.0 gallons per 100 sqft and fully embed Permafab polyester reinforcement. 6) Apply Alphaguard BIO top coat (white) at rate of 2.0 gallons per 100 sqft. 7) Provide 20-year manufacturer's warranty with proactive inspections at years 2, 5, 10, & 15. 2. Roof Area #2 MAINT - Sections 21-23: a. Area of Roof(s): estimated 17,950 sq. ft. b. Description of Work: Restoration roofing specified in Division 07 Section 075600.13 Fluid-Applied Membrane Roofing, Insulated (AlphaGuard) 1) Roof Sections 21 & 23 - approximately 4,450 sqft. 2) Complete roof diagnostic moisture survey to identify existing wet/defective insulation prior to start of project and provide to owner. 3) Remove existing wet/defective roof system components down to the structural metal deck and replace with like materials to match existing. 4) Clean roof using specified RoofTec cleaning service. 5) Apply Alphaguard WB Primer and allow to cure prior base coat application. 6) Apply Alphaguard BIO base coat at rate of 3.0 gallons per 100 sqft and fully embed Permafab polyester reinforcement. 7) Apply Alphaguard BIO top coat (white) at rate of 2.0 gallons per 100 sqft. 8) Provide 20-year manufacturer's warranty with proactive inspections at years 2, 5, 10, & 15. c. Description of Work: Restoration roofing specified in Division 07 Section 075416 Ketone Ethylene Esther (KEE) Roofing 1) Roof Section 22 - approximately 13,500 sqft 2) Remove existing roof system components down to the structural metal deck. 3) Mechanically fasten new R-30 tapered polyisocyanurate insulation course. 4) Install 1/4 " thickness DensDeck Primer gypsum cover board using low rise foam insulation adhesive. 5) Install new 60 mil TremPly KEE FB membrane using POWERply Endure BIO urethane membrane adhesive. 6) Install related flashings and metal details as required to meet manufacturer's warranty requirements. 7) Provide 30-year manufacturer's warranty with proactive inspections at years 2, 5, 10, 15, 20, & 25. Bid Result. KCTC:Van Doorn Roofing $76,175.00 MAINT:Modern Roofing Inc. $261,000.00

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$595,738.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
36
Bidding Soon
581
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2022

March 21, 2022

img_map_placeholder

1655 E Beltline Ave NE, Grand Rapids, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.