BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Harvey, Louisiana. Working plans call for site work for a playground / park / athletic field.

A bid bond will be required with bid submission in the amount of 5% of the total bid, unless otherwise stated in the bid specifications. All sureties must be in original format (no copies) When submitting a bid online, vendors must submit an electronic bid bond through the respective online clearinghouse bond management system(s) as indicated in the electronic bid solicitation on Central Auction House. No scanned paper copies of any bid bond will be accepted as part of the electronic bid submission All awards in excess of $25,000.00 will require both a performance and a payment bond. Unless otherwise stated in the bid specifications, the performance bond requirements shall be 100% of the contract price. Unless otherwise state in the bid specifications, the payment bond requirements shall be 100% of the contract price. Both bonds shall be supplied at the signing of the contract. We extend this bid to cover all labor, materials, and necessary essentials to remove and replace a one hundred and fifty (150) feet long x thirty (30) feet high section of chain link fencing and attached poles at the above location. Remove one hundred and fifty (150) feet of existing exterior six (6) feet chain link fencing under the thirty (30) feet high fencing. The successful bidder shall supply all labor, materials and necessary essentials to perform the following at ML King Playground. o Remove and replace a one hundred and fifty (150) feet long x thirty (30) feet high section of chain link fence and attached poles. o Parks and Recreation will not be responsible for any materials or equipment on site while the job is in progress. o Awarded vendor must provide their own dumpster on site to dispose of debris and must get dumpster location approved. o Vendor shall be responsible for furnishing and installing all equipment, parts, supplies, supervision and personnel needed, plus any permits, fees, etc. needed to complete this job. o Fabric: 120" 9-gauge 2.0 oz (2" mesh) KT Chain Link Fence. o Top Rail: 1 5/8" O.D. Schedule 40 Pipe, 2.27 lbs. per foot. Top rail to be 21 feet in length joined with 1 5/8 "galvanized sleeve. o Line Post: 3" Schedule 40 Pipe, 5.79 lbs. per foot. Line post 10' on center spacing. Each to have concrete footings measuring 24" in diameter and at a 50" depth. o Terminal Post: 4" O.D. Schedule 40 Pipe, 9.11 lbs. per foot. Each to have concrete footings measuring 24" in diameter, and at a 50" depth. o Bracing: 1 5/8 O.D. Schedule 40 Pipe, 2.27lbs. per foot, used for both middle rail and top rail. o Fittings: Beveled brace band and galvanized with nut carriage bolt, pressed steel combo rail-end, 14-gauge steel boulevard clamp, pressed steel loop cap, 3/4" steel tension bar, beveled tension band and galvanized with nut carriage bolt. o Tie Wire: 9 1/2 9-gauge aluminum tie wire and 8 1/4 " 9-gauge aluminum tie wire spaced 6" on center for line posts and 6" on center for rails. o Concrete Footings: To be truck poured concrete. o Remove one hundred and fifty (150) feet of existing six (6) feet exterior fencing under the thirty (30) feet high fencing.

Final Planning

Playgrounds / Parks / Athletic Fields

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
33
Bidding Soon
527
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

March 19, 2023

img_map_placeholder

2400 Lester St, Harvey, LA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.