BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2022 at 7:00 PM

Updated November 15, 2023

Site work for a bridge / tunnel in Redwood City, California. Completed plans call for site work for a bridge / tunnel.

Project is estimated to begin in April or May of 2022. Engineer's Estimate of Cost: $ 4,000,000 The work to be done consists, in general, of removing an existing metal pedestrian bridge and a concrete vehicle bridge, as well as clearing and grubbing, installing rock slope protection, placing a soil nail wall, modifying an existing bridge abutment, and placing a prefabricated pedestrian bridge and concrete staircase, as well as any other items and details not mentioned above, but required by the Project Plans, Standard Specifications and these Special Provisions, and the direction of the Engineer All RFI requests are due by February 18, 2022.

Bid Results

Bridges / Tunnels

$3,699,464.00

Public - County

Site Work

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
172
Bidding Soon
2,746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2022

June 1, 2022

Project location map

Mirada Road, Redwood City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.