BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boardman, Ohio. Completed plans call for site work for a water / sewer project.

Opinion Of Probable Construction Cost: $200,000.00 For Base Bid And All Alternates Completion Dates: Base Bid Or Base Bid And Alternate 1: May 28, 2022 Alternates 2 - 5: June 30, 2022 Documents may be ordered by registering and paying online .Please contact planroom@ctconsultants.com or call (440) 530-2395 if you encounter any problems viewing, registering or paying for the documents A. The bid documents contain bid forms for 1 base bid and 5 alternates. The project consists of two project areas. At the Wildwood Drive project area, the work includes dewatering the crossing, excavating the roadway approach to the crossing footing bottom, pouring a concrete plug along the outside edge of the footings and a crossing floor slab, backfilling and replacing the asphalt pavement, and replacing catch basins and storm sewer in the vicinity. At the Ewing Road project area, the work includes stream corridor enhancements (erosion protection, spillway & side channel, dam removal, dam modifications, and repair above the crossing). Also included is restoration to existing or better conditions. B. The Contractor shall coordinate any road closures with the Engineer and the Boardman Township Roads Department. Approval must be obtained from the Roads Department Superintendent 48 hours prior to any temporary closure. C. United States Army Corps of Engineers (USACE) Non-Reporting General Permits for work in waters of the state have been prepared (NWP #3 and NWP #13). These permits must be kept on site during construction and copies are available from the Engineer upon request. D. The Contractor is prohibited from putting, placing, entering, storing, or otherwise allowing equipment and/or construction materials in the stream unless the proposed work as detailed and illustrated in the plans allows. All construction equipment/materials must otherwise remain above the existing streambanks, outside of the existing stream. The project is located at the crossing of Cranberry Run at Wildwood Drive and the crossing of Cranberry Run at Ewing Road in Boardman Township, Mahoning County, Ohio.

Award

Water / Sewer

$173,355.00

Public - City

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
82
Bidding Soon
1,238
All Active Projects
399
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

March 28, 2022

img_map_placeholder

Multiple Locations, Boardman, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.