BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a civil project in Boardman, Ohio. Completed plans call for site work for a water / sewer project.

The work for which Bids are invited consists of the fumishing ol all materials and labor for the c o m b i n e d construction of the following two projects: The Cranberry Run North Phase One Restoration consists of the construction of approximately 300 LF oJ stream channel after filling an existing pond and the grading of floodplain benches and wetland cells along approximately 950 LF of stream adjacent to lhe restoration reach. These areas of stream channel are not to be disturbed durino construction. Excess material generated in these areas will be used t-o create a walking trail throughout the project site. The Cranberry Run South Restoration project consists of floodplain restoration and reconnection on three properties owned by Boardman Township in Mahoning County, Ohio. This restoration will consist of regrading the stream banks beyond the ordinary high-water mark to establish floodplain connection for the stream channel. Excavated material will be regraded as mounds on-site. All other excess material will be hauled off to a predetermined offsite location. All excavations will be stabilized and seeded following construction. The totaI estimated construction cost for the Cranberrv Run North Phase One Restoration project is $132,489.00. However, drie to the nature of funding for this project, it has been divided into separate bid schedules. One bid schedule for the area from Wildwood Drive to the southern side of Cadillac Drive with an estimated construction cost of $99,873.00, and another bid schedule for the area north of Cadillac Drive with an estimated construction cost of $32.616.00. The total estimated construction cost tor he Cranbsrry Run South Restoration project is $68.064.00, Bidders are required to register with and obtain Bidding Documents from the office of the Boardman Township Road DepartmenI. Each bidder is required to fumish with its proposal, a Bid Guaranty and Conkact Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security fumished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surely. Each proposal must contain the full name of the party or parties submitting the proposal and all persons intEURrosted therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. All contractors and subcontractors involved with the proiect will, to the extent practicable use Ohio products, materials, seruices and labor in the implementation of the project. Additionally, contractor compliance with equal employment opportunity requirements ot the Ohio Administrative Code Chapter 123, the Govemor's Executive Order of 1972. and Govemor's Executive Order 8+9 shall bo reouirEURd, Bidders must comply with the prevailing wage rates on Public lmprovements in Mahoning County and Boardman Township, Ohio as determined by the Ohio Bureau ol Employment Services, Wage and Hour Division, (614]. 644-2239. The right is reserved by the Boardman Township Trustees to reject any and all Bids, to waive informalities or to accept any Bid which is deemed favorable to Boardman Townshio. Ohio.

Award

Water / Sewer

$174,240.00

Public - City

Site Work

25

9

26

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
98
Bidding Soon
1,167
All Active Projects
450
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2022

February 1, 2023

img_map_placeholder

Multiple Locations, Boardman, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.