Published April 8, 2025 at 8:00 PM
Updated April 9, 2025
Renovation of a clubhouse / community center in Attleboro, Massachusetts. Conceptual plans call for the renovation of a clubhouse / community center.
Update: This capital project entails replacing the 10-ton Carrier unit (approximately 26 years old) and the TRANE unit (approximately 20 years old) with a new mini-split system including the following equipment: one Daikin 14-ton VRV condensing unit, one Daikin 2-ton ceiling suspended on way blow unit, two Daikin 3-ton ceiling suspended on way blow units, one Daikin .7k BTU wall mount head, three Daikin 2-ton wall mount heads, piping, thermostats, condenser stands, related roof work, waterproofing, electrical equipment, and subpanel. In addition, the scope includes demolition, permitting, and engineering. New rooftop unit are not feasible, as their size is too big for the roof. The current HVAC system continues to fail, resulting in the lack of air conditioning on all floors of the Senior Center. Due to the age of the system, equipment parts are no longer available. The Senior Center serves older adults many of whom have respiratory challenges and thereby making it essential to provide adequate and functioning air conditioning. The Senior Center also serves as an emergency cooling center for the city. Project is included in City of Attleboro Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update: https://tinyurl.com/5ynsjve8 This capital project entails replacing the 10-ton Carrier unit (approximately 25 years old) and the TRANE unit (approximately 19 years old) as well as the variable frequency drive and controls in order to reduce noise caused by a low- capacity operation. Excessive noise affects programming and functioning at the Center. The new units will be cost-efficient, enhance air quality, and reduce noise pollution. Project is included City of Attleboro Fiscal Year 2025-2029 Page no 32 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This capital project entails replacing the 10-Carrier unit (approximately 25 years old) and the TRANE unit (approximately 19 years old) as well as the variable frequency drive and controls in order to reduce noise caused by a low-capacity operation. The COA's Outreach staff is often unable to hear their clients (whether on the telephone or in the office) when the overhead vents activate and a forceful surge of air pushes through the vents. This disruption occurs without notice, sometimes lasting as long as twenty minutes, and causes significant difficulties for the staff to perform its duties. This project is in included in the City of Attleboro FY 2022-2026 Capital Improvement Plan (CIP). As of February 04, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Clubhouse / Community Centers
$300,488.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
25 S Main St, Attleboro, MA
Related To This Project
Attleboro, MA
Bid Date: Mar 02 2022
Attleboro, MA
Bid Date: Feb 28 2022
Attleboro, MA
Bid Date: Mar 09 2022
Attleboro, MA
Bid Date: Mar 02 2022
Attleboro, MA
Bid Date: Oct 25 2023
Attleboro, MA
Bid Date: Dec 09 2021
Attleboro, MA
Bid Date: Dec 22 2020
Attleboro, MA
Bid Date: Apr 19 2022
Attleboro, MA
--
Attleboro, MA
Bid Date: Feb 03 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.