BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kailua, Hawaii. Completed plans call for the renovation of a educational facility.

Furnish materials, labor, and equipment necessary to install 14 Haiku Ceiling Fan with Aluminum 52" blades (with long extension tube) fans in the Kalaheo High school Cafeteria. I. Fans: a. Contractor shall supply and install 14 Haiku Ceiling Fan with Aluminum 52" blades (with long extension tube) (see attached) or a preapproved equal. b. Contractor will install/replace 12 fans and install 2 new fans c. Following are additional parts as recommended by the Big Ass Fan Company. 1. Lutron Low Voltage Dimmer Switches to control fans (3 each) 2. Low Voltage Controller (14 each) d. Contractor shall be responsible for any additional materials or hardware necessary for a complete installation. e. The installation of the fans shall be per manufacturer's recommendation. II. Power for new fans a. Contractor will be responsible to check if sufficient electrical is available before ordering the equipment. b. Contractor will be responsible to supply all electrical materials and equipment to supply power to the fans from the nearest adequate circuit c. Contractor shall remove existing (12) fans and replace with new. Contractor shall cover all unused switch and light fixture boxes and any additional conduits, boxes, breakers and accessories necessary for a complete installation shall be the contractor's responsibility. d. Contractor will be responsible for connecting and configuring the control circuit to each fan and switch and routing control lines to and from each fan back to the control area (includes all material) e. Switches for fans will be located near the existing current lighting switches. f. Electrical work will be discussed in detail at the mandatory prebid meeting. III. Installation (Onsite Work): a. The exact onsite start date will be coordinated with the shipment/arrival of the fans. Once onsite the contractor will have 14 working days to complete their work. b. All onsite work shall be coordinated with school officials (Principal) to minimize disruption to the student's use of the cafeteria. c. The contractor will be responsible for protecting the school property throughout the duration of the construction. d. The contractor must put away all equipment daily for after hour use by the school All work shall be per manufacturer's specifications and recommendations, and shall be performed to industry standards. Contractor must follow all current local city & county codes. Along with the Manufacturer's standard material (Fan) warranty, the contractor shall provide a one-year written warranty for defects in materials and workmanship on this project. This job is scheduled to commence upon award of a purchase order and be completed by August 1, 2022. Onsite work will be coordinated with the delivery of the fans. Project Coordinator: Linda Luke (808)349-7131, linda.luke@k12.hi.us

Award

Educational

$43,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
24
Bidding Soon
285
All Active Projects
112
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 28, 2022

March 30, 2022

August 1, 2022

img_map_placeholder

730 Iliaina St, Kailua, HI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.