BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a sidewalk / parking lot in Clayton, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of March 28 2022, Coate Construction LLC was awarded the contract with a bid of $108,450.00. The anticipated start date is the last week of April with a completion date before July 5, 2022. This year's work consists of piecework roads (estimated 2400 feet of type 3 21" roll curb), There may be longer stretches that may be able to accommodate a slip form machine. The approaches may or may not require replacement so any slip form machine used must pass in front ofthe good approaches. This year's (2022) project involves the repair of curbs, catch basins, and drive approaches (aprons) in one area of the City of Clayton. All identified concrete work is estimated and may change if property owners' complete repairs prior to this contract, or if other damage is identified. The identified area is Union Road, 3 Roads in the Savina Hills area, 1 Road in the Honeybrook Plat and 4 Roads along Cheri Lynne. There are an estimated 7 approaches, (Estimated 1450 square feet), that the city has identified as being in poor condition and may require replacement. These approaches will be low profile and can be part ofthe curb assessment project through the city since the work is necessary to install the expansion joint. Any additional request for approach work, (low profile), or full driveways, will need to be negotiated with the homeowner and the homeowner will be responsible to pay the contractor for any additional flat work, or curb needed to perform the work. However, the contractor must provide the same cost to residents as identified in the city approach work or flat work. There are an estimated 5 Clayton type A standard (22"x44" inside) catch basins that may need replaced. The city will provide the catch basins. There may be a need to replace some sidewalk sections in these various areas in the project area, so an additional 400 square feet of 4" sidewalk will be added to this project.

Award

Sidewalks / Parking Lot

$108,450.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
87
Bidding Soon
1,226
All Active Projects
558
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

April 27, 2022

img_map_placeholder

Multiple Locations, Clayton, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.