EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 18, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Burlington, Vermont. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Deadline to Submit Questions: February 21, 2022 at 5:00 PM Each BID must be accompanied by a certified check payable to the City of Burlington for five percent (5%) of the total amount of the BID. A BID bond may be used in lieu of a certified check. This contract is subject to the Burlington Pre-Qualification of Construction Contractors, the Burlington Livable Wage Ordinance, the Burlington Union Deterrence Ordinance, and the Burlington Outsourcing Ordinance. No bid will be accepted without signed certificates of compliance with listed ordinances This project is located along Mansfield Avenue, and extends from Colchester Avenue to North Street. Project work consists of the construction of a 10-foot wide asphalt sidepath, sidewalk ramps, curbing, bump-outs, raised crosswalks, structure installation, striping, signage, and other incidentals. Work shall not begin prior to April 15, 2022. The Contract shall be completed on or before August 12, 2022. Work continued after August 12, 2022 shall be subject to accrued liquidated damages as set forth by the GENERAL and SPECIAL PROVISIONS. For this Proposal the Engineers Estimate of the base bid is between $250,000 and $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. During the advertisement phase of this project, all questions shall be addressed solely to the Municipal Project Manager (MPM) in writing to the email provided below: Olivia Darisse, P.E. Burlington Public Works Engineer odarisse@burlingtonvt.gov All questions must be submitted before February 21, 2022 at 5:00 PM. Questions received after this time may not be answered. Any revisions, addendums and answers to questions received by the due date for questions will be sent to bidders who received this Invitation by the City via email by February 23 at 5:00 PM. In addition, revisions will be posted on the City's RFP portal. It is the responsibility of the bidder to ensure that a valid email is submitted to the plan distributor, Olivia Darisse to the contact information above. It is recommended that bidders submit secondary contact information. The bidder shall acknowledge receipt of all addenda in the bid form. Failure to acknowledge the receipt of addenda will result in disqualification of the bid. For VTrans qualification questions please contact Contract Administration prior to the bid opening. For information contact Jon Winter at 802-828-2643. The general contractor foreman shall attend a weekly construction progress meeting with City representatives. The design team and construction subcontractors shall be involved in these meetings as necessary and requested. The general contractor shall prepare an updated construction schedule documenting the upcoming construction activities. The City shall be responsible for securing a meeting location and preparing all meeting materials, notes, and action items.

Award

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
116
Bidding Soon
1,644
All Active Projects
753
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2022

April 15, 2022

img_map_placeholder

Mansfield Ave, Burlington, VT

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mansfield Avenue Sidepath and Traffic Calming Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.