BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Pharr, Texas. Completed plans call for site work for a water / sewer project.

General scope for this work is to drill one HDD approximately 1,104' feet in length. The drilling rig will be located on the southeast side of the levee with the pullback area located on the northwest side of the same levee. All materials, including coated line pipe and fittings, shall be provided by CONTRACTOR. The line pipe for the drill shall be strung out and cribbed along the existing Right of Way (ROW). COMPANY has negotiated additional workspace available for CONTRACTOR's use, approximately 200' x 150' at the proposed HDD entry and exit points. CONTRACTOR shall weld the pullback segment and tie-in spools. CONTRACTOR shall provide a CAMS-approved x-ray subcontractor to perform NDT inspection on 100% of the welds. After the x-rays have been completed and the welds accepted, CONTRACTOR shall perform a pre-pullback 4-hour hydrotest, and then coat the field joints. The drilling rig will mobilize on the southeast side of the levee and drill toward the northwest side. The drill path shall be offset from the existing pipeline to facilitate tie-in to the existing pipeline. Once the path has been successfully drilled and reamed, the pullback section shall be pulled into the wellbore. CONTRACTOR is required to support the line pipe in the ditch to prevent sagging. CONTRACTOR is responsible for supply of concrete sacks to be used for support. Once pulled back, tie-in spools shall be fabricated, x-rayed and the field joints and fittings coated. Another hydrotest, 8-hours, shall be performed on the tie-in spools and segment installed in the HDD. CONTRACTOR shall run an aluminum gauging pig through the line, remove all water from the test section and dry the line. After the line has been dried, the final tie-in welds shall be completed and x-rayed, and the ditch shall be backfilled. The deadline to ask questions is 2/23/2022 3:00:00 PM CST

Bid Results

Water / Sewer

$398,922.00

Public - County

Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
20
Bidding Soon
406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2022

April 4, 2022

Project location map

Multiple Locations, Pharr, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.