Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2022 at 8:00 PM
Updated December 3, 2024
Demolition, site work, renovation and addition to an educational facility in Wylie, Texas. Completed plans call for the addition of a 109,000-square-foot educational facility; and for the renovation of a educational facility.
Sealed proposals, addressed to the designated location at the Farmersville ISD for the project named Farmersville High School addition and Multipurpose Building in accordance with plans, specifications and contract documents adopted by the Farmersville ISD, hereinafter called the owner, will be received by Farmersville ISD CSP Packages available to prospective Proposers are as follows: CSP 01-B FINAL BUILDING CLEANING CSP 02-A DEMOLITION CSP 03-A BUILDING CONCRETE CSP 03-D CONCRETE POLISHING CSP 04-A MASONRY CSP 05-A STRUCTURAL STEEL & ERECTION CSP 06-A MILLWORK CSP 07-A ROOFING & SHEETMETAL CSP 07-C SPRAYED ON FIREPROOFING AND INSULATION CSP 08-A FRAMES, DOORS & HARDWARE CSP 08-B GLASS & GLAZING CSP 08-C OVERHEAD COILING DOORS CSP 09-A DRYWALL & ACOUSTICAL CSP 09-B SHEET VINYL FLOORING CSP 09-C TILING CSP 09-D FLOOR COVERINGS CSP 09-E PAINTING & WALLCOVERING CSP 09-G WOOD FLOORING CSP 09-H RESILIENT ATHLETIC FLOORING CSP 10-A BUILDING SPECIALTIES CSP 10-C ATHLETIC SIT DOWN LOCKERS CSP 10-D METAL LOCKERS CSP 10-G IDENTIFICATION DEVICES CSP 10-I ALUMINUM CANOPIES CSP 10-L FOLDING FIRE DOORS CSP 11-A FOOD SERVICE EQUIPMENT CSP 11-B COMMERCIAL LAUNDRY EQUIPMENT CSP 11-C STAGE EQUIPMENT & CURTAIN(S) CSP 11-E ATHLETIC EQUIPMENT CSP 11-F SCOREBOARDS CSP 12-A LABORATORY CASEWORK & FIXTURES CSP 12-C FIXED AUDIENCE SEATING CSP 12-D WINDOW TREATMENTS CSP 12-F MUSIC STORAGE EQUIPMENT CSP 14-A ELEVATOR(S) CSP 21-A FIRE SPRINKLER SYSTEM CSP 22-A PLUMBING CSP 23-A HVAC CSP 26-A ELECTRICAL CSP 27-A VOICE AND DATA CABLING CSP 27-B AUDIO/VISUAL SYSTEM CSP 27-C COMMUNICATION SYSTEMS CSP 28-A FIRE ALARM SYSTEMS CSP 31-A EXCAVATION CSP 31-E TERMITE CONTROL CSP 32-A CONCRETE PAVING CSP 32-B LANDSCAPE & IRRIGATION CSP 32-E SYNTHETIC TURF CSP 33-A SITE UTILITIES *FOR QUESTIONS AND CLARIFICATIONS, PLEASE CONTACT LANCE AARON @ laaron@gallaghertx.com **NOTICE: Project Completion Date(s): Farmersville HS Addition July 1, 2023 Farmersville HS Multi-Purpose Building March 1, 2023
Bid Results
Educational
$42,157,084.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
July 5, 2022
499 S State Hwy 78, Wylie, TX
Related To This Project
Wylie, TX
--
Wylie, TX
Bid Date: Nov 15 2021
Wylie, TX
--
Wylie, TX
Bid Date: Jan 11 2024
Wylie, TX
Bid Date: Oct 04 2023
Wylie, TX
Bid Date: Dec 19 2023
Wylie, TX
Bid Date: Jun 23 2022
Wylie, TX
Bid Date: Feb 27 2020
Wylie, TX
Bid Date: Mar 24 2022
Wylie, TX
Bid Date: Mar 24 2022
Wylie, TX
--
Wylie, TX
--
Wylie, TX
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
