Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 16, 2023 at 7:00 PM
Updated January 25, 2024
Outdoor lighting for a transportation facility in Fort McMurray, Alberta. Completed plans call for outdoor lighting for a transportation facility.
The Fort McMurray International Airport is upgrading its airside electrical system for all Taxiways and Aprons, alongside floodlighting upgrades on Aprons I & II. The Runway 08-26 lighting was previously upgraded on a separate project. The proposed project will include the removal and disposal of existing edge lights and cabling on Taxiways A/B/C/D/E/F/G/H and J, as well as Aprons I and II. New LED edge lights and cabling will be installed at the same locations as the existing edge lights. Sixteen (16) Runway Guard Lights (RGL) will also be replaced, and two (2) new Runway Guard Lights installed. Key components of the project include: Removal and replacement of all taxiway edge lights and associated cabling; Removal and replacement of all apron edge lights and associated cabling; Removal and replacement of 16 RGLs; Installation of 2 new RGLs; Upgrade of Apron floodlighting fixtures Official bid documents must be obtained from www.merx.com
Award
Transportation Terminals
$1,700,000.00
Public - County
Outdoor Lighting
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2022
July 18, 2022
100 Snow Bird Way, Fort McMurray, AB
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
