BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and renovation of a municipal facility in Steger, Illinois. Completed plans call for the demolition of a 200-square-foot municipal facility; and for the renovation of a 2,400-square-foot municipal facility.

Insulation Removal 1. Removal of approximately 2400 square feet of blown in insulation. Contractor responsible for their own measurements. 2. All waste must be properly and responsibly disposed of. 3. Contractor will remove all interior and exterior garbage and waste. 4. There are active plumbing lines and electrical pipe in the attic, contractor is responsible for repairing any damage caused. 5. Minor demo in kitchen to include removal and proper disposal of: a. kitchen countertop and cabinets. b. kitchen floor, including entry way, approximately 200 s/f c. two (2) swing doors from kitchen to living room d. refrigerator side walls (2) e. back splash including silver panel Projects will be completed within 30 days after the Notice to Proceed has been issued. The successful Bidder shall comply with all applicable provisions of the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. Requests For Information (RFI) due via email to Purchasing Agent: Feb 11, 2022 @ 5:00 p.m. Tom Conlon Phone: (312) 603-8968 or Fax: (312) 603- 9961 Email: fpd.purchasing@cookcountyil.gov If you have any questions, please email: fpd.purchasing@cookcountyil.gov

Post-Bid

Municipal

$15,000.00

Public - County

Demolition, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
94
Bidding Soon
1,755
All Active Projects
784
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2022

March 28, 2022

img_map_placeholder

To Be Determined, Steger, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.