Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2025 at 8:00 PM
Updated May 4, 2025
This is a service / maintenance or supply contract in Steger, Illinois. Contact the soliciting agency for additional information.
This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2025, at 1:00 PM, at the Region One/District One Office in Schaumburg. Phase II engineering services are required to provide the preparation of contract plans, specifications, cost estimates, supplemental surveying, geotechnical services, and all other work to complete the intersection reconstruction of IL 1 at County Line Road. The project's scope includes preparation of roundabout design plans, traffic plans, signage, pavement markings plans, lighting plans, and any other related aspects associated with roundabout design. The Consultant must demonstrate experience in roundabout design by providing a minimum of one project example showcasing their experience in this field. The Consultant will also review and prepare plans to ensure all plans are within the framework of the department's policies and procedures, local agency's requirements, and all applicable manuals and schedules. The completion date for this contract will be 24 months after authorization to proceed. The Prime firm must be prequalified in the Highways (Roads and Streets) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 20 - RFQ - IL 1 at County Line Rd, Phase II Project
Conceptual
Roads / Highways
$7,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
IL-1, Steger, IL
Related To This Project
Steger, IL
Bid Date: Jun 10 2025
Steger, IL
Bid Date: Apr 15 2025
Steger, IL
Bid Date: Oct 29 2024
Steger, IL
Bid Date: May 13 2024
Steger, IL
Bid Date: Jun 13 2024
Steger, IL
Bid Date: Oct 24 2023
Steger, IL
Bid Date: Oct 12 2023
Steger, IL
Bid Date: Feb 13 2020
Steger, IL
Bid Date: Feb 25 2022
Steger, IL
Bid Date: Jul 15 2022
Steger, IL
Bid Date: Oct 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
