BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

This is a service / maintenance or supply contract in Steger, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 22, 2025, at 1:00 PM, at the Region One/District One Office in Schaumburg. Phase II engineering services are required to provide the preparation of contract plans, specifications, cost estimates, supplemental surveying, geotechnical services, and all other work to complete the intersection reconstruction of IL 1 at County Line Road. The project's scope includes preparation of roundabout design plans, traffic plans, signage, pavement markings plans, lighting plans, and any other related aspects associated with roundabout design. The Consultant must demonstrate experience in roundabout design by providing a minimum of one project example showcasing their experience in this field. The Consultant will also review and prepare plans to ensure all plans are within the framework of the department's policies and procedures, local agency's requirements, and all applicable manuals and schedules. The completion date for this contract will be 24 months after authorization to proceed. The Prime firm must be prequalified in the Highways (Roads and Streets) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 20 - RFQ - IL 1 at County Line Rd, Phase II Project

Conceptual

Roads / Highways

$7,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
274
Bidding Soon
3,343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

IL-1, Steger, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.