Site work, paving, outdoor lighting and new construction of a mixed-use development in Golden, Colorado. Completed plans call for the construction of a 8,000-square-foot, two-story above grade municipal facility; for site work for a municipal facility; laboratory facility; for outdoor lighting for a sidewalk / parking lot; data center facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
NREL intends on issuing a Request for Proposal within the next 60-90 days of this notice and will request small business industry interests through the submission of a resumes and capability statements. Detailed requirements will be included in the posting. If your organization would like to submit a capability statement, please submit to the point of contact below or submit as an interested organization as directed herein. Please specify your experience with projects ranging from $1,000,000.00 to $10,000,000.00. The National Renewable Energy Laboratory (NREL) is a national laboratory owned by the U.S. Department of Energy (DOE). NREL is the only federal laboratory dedicated to research, development, commercialization, and deployment of renewable energy and energy efficiency technologies. NREL is managed and operated for DOE's Office of Energy Efficiency and Renewable Energy by The Alliance for Sustainable Energy (Alliance), the "M&O Contractor." Over the past several years the research mission at the National Renewable Energy Laboratory's (NREL) Flatirons Campus (FC) has expanded to include multiple renewable energy technologies and the integration of the technologies into the electrical grid. Recently, the mission has grown to include DOE's Integrated Electrical Systems at Scale (IESS) initiative. With all of these new technologies being integrated with each other and with the site being connected to other NREL, DOE and academic campuses through IESS, the FC needs a new facility to support the management, data collection and coordination of these research assets. NREL's new FC Control Center Facility (CCF) will be focused on operational control and monitoring of IESS research projects utilizing research assets at the Flatirons Campus as well as at NREL's Energy Systems Integration Facility (ESIF) (at the South Table Mountain Campus) and at other national labs, universities, and other research institutions around the world. The CCF will provide computing and data visualization capabilities to support research data acquisition, analysis, and visualization as integrated real-time experiments are conducted across multiple sites. Description of Work: The CCF will be an 8,000-sf two-story building with a control room, a data center, conference rooms, a 2-D visualization room, and support spaces. The building will be located north of the main road and east of the 5 MW Dyno building. The FC site and utilities will be expanded to support the new building. The project includes a parking lot, driveway, sidewalks, landscaping, a detention pond and an onsite wastewater treatment system (OWTS) along with other site improvements. The objective of this Subcontract is to fully and safely construct the new building at the FC designed and described in the design specifications documents. An EPA Construction General Permit and Stormwater Pollution Prevention Plan will be required to be obtained, maintained and closed by the Subcontractor as required by the construction documents. Submittals shall be provided in electronic version for NREL's use and records. The Subcontractor will establish and maintain its own Document Control System (DCS) database for electronically storing Quality Assurance inspection and testing data and tracking submittals including substantiation submittals. Database will be structured so NREL's added information will not be overwritten or deleted by incorporation. Backup, security controls, and offsite location is required for the DCS. A new Onsite Wastewater Treatment System is included in the scope of work to provide sanitary sewer service to the CCF. The design documents for the OWTS are provided in Exhibit H. The wastewater treatment system permit from Jefferson County will be obtained by the design team. Commissioning for the system is to be performed by the Subcontractor. Provide a separate cost proposal for this scope of work. Location: Offerors shall have a bona-fide office located within 50 miles of NREL's Flatirons Campus or shall be able to demonstrate their capability to perform in these areas: National Renewable Energy Laboratory (NREL) Flatirons Campus Laboratories and Offices 19001 W. 119th Avenue Arvada, CO 80007 Other Requirements: This procurement is issued as a competitive solicitation. A bidders list will not be publicly distributed. Respondents to this solicitation notice will be given access to the project specification documents upon receipt of the Notice of Intent to Propose. No subcontract award will be made to any contractor that is not registered or in the process of registering with the System for Award Management (SAM). Please visit the SAM website at https://sam.gov/content/entity-registration for instructions on how to register. *Some or all of the documents for this project may be controlled unclassified information and property of the United States Government and if so we will not be obtaining them. Users must register with Beta.Sam in order to view and obtain controlled unclassified documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Municipal
$10,000,000.00
Public - Federal
New Construction, Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2023
April 28, 2023
19001 W 119th Ave, Golden, CO
Related To This Project
Golden, CO
Bid Date: Jun 15 2022
Golden, CO
Bid Date: Jun 17 2022
Golden, CO
Bid Date: May 16 2022
Golden, CO
Bid Date: Jun 29 2022
Golden, CO
Bid Date: May 24 2022
Golden, CO
Bid Date: Jul 13 2022
Golden, CO
Bid Date: Jun 30 2020
Golden, CO
Bid Date: Jul 27 2021
Golden, CO
Bid Date: Apr 01 2022
Golden, CO
Bid Date: Apr 08 2022
Golden, CO
--
Golden, CO
Bid Date: May 19 2022
Golden, CO
Bid Date: May 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.